Inspections for the day of: Thursday, January 31, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00103 BLD-Footing1/30/20021/31/20021/31/2002 12:00:00 AMAPART
ft ###-####- jerry wip--20% ready at time of inspection 1/31/2002 10:07:36 AM
BLD01-01662 BLD-Other1/30/20021/31/20021/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/30/2002 at 18:29:42. Contact: ###-####. 2-hr fire wall 1/31/2002 9:29:53 AM
BLD01-01665 BLD-Other1/30/20021/31/20021/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/30/2002 at 18:30:56. Contact: ###-####. 2-hr fire wall 1/31/2002 9:30:07 AM
BLD01-03255 BLD-Framing/Rough-in1/30/20021/31/20021/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/30/2002 at 14:49:42. Contact: ###-####. c/n--ok to insulate 1/31/2002 9:13:44 AM
BLD01-03223 BLD-Footing1/30/20021/31/20021/31/2002 12:00:00 AMAPART
CHRIS ###-#### 70% ready at time of inspection. 1/31/2002 10:21:20 AM
MEC02-00193 Rough-in1/30/20021/31/20021/31/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/30/2002 at 16:10:50. Contact: ###-####.
BLD02-00041 BLD-Foundation1/31/20021/31/20021/31/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/31/2002 at 07:38:37. Contact: ###-####. 95% ready at time of inspection 1/31/2002 12:49:36 PM
BLD01-02794 BLD-Final1/31/20021/31/20021/31/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/31/2002 at 07:53:17. Contact: ###-####. c/n posted-insulation in crawl needs completed, mech. and plumbing final needed also. 1/31/2002 2:06:32 PM
BLD01-02405 BLD-Framing/Rough-in1/31/20021/31/20021/31/2002 12:00:00 AMPFAIL
###-#### alan c/n posted-need to completed guardrail at 2nd floor, remove debris from crawl, fire cuaulk penetration on 1-hr fire wall in garage and redo stairs in garage to meet code--exceeds riser height and 3/8" tolerance. 1/31/2002 3:04:29 PM
BLD02-00050 BLD-Footing1/31/20021/31/20021/31/2002 12:00:00 AMPPART
###-#### CLINT wip--5% ready at time of inspection 1/31/2002 1:39:45 PM
BLD02-00049 BLD-Foundation1/31/20021/31/20021/31/2002 12:00:00 AMPPART
###-#### CLINT 95% ready at time of inspection--hd not installed. 1/31/2002 1:12:57 PM
MEC01-03610 Final1/31/20021/31/20021/31/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/31/2002 at 09:01:58. Contact: ###-####. LOCK BOX 10956
BLD01-03038 BLD-Footing1/31/20021/31/20021/31/2002 12:00:00 AMPPART
MATT ###-#### wip--20% completed at time of inspection. 1/31/2002 2:29:54 PM
MEC02-00193 Rough-in1/30/20021/31/20021/30/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 01/30/2002 at 15:14:58. Contact: . Disp set to [CANC] by a contractor via Hello! on 01/30/2002 at 16:09:36.