BLD00-03517
| BLD-Aging Inspection | 1/31/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | | DONE |
|
|
|
BLD02-02395
| BLD-Conference | 1/27/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | A | PASS |
|
|
|
BLD02-02753
| BLD-Final | 1/30/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | A | PART |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
waiting on trades, looks ok so far 1/31/2003 10:41:22 AM
|
BLD01-02515
| BLD-Conference | 1/30/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | A | PART |
|
|
partially turned over to code enforcement, need to wait untill we can talk to Kathy W. about bonds in place, if they are still good or not 1/31/2003 10:40:22 AM
|
MIS02-00156
| BLD-Conference | 1/30/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | A | PART |
|
|
see Linda for plans
linda is working w/ arch. now 1/31/2003 2:45:41 PM
|
MIS02-00310
| BLD-Conference | 1/30/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | FAIL |
|
|
c/n posted to obtain or apply for permits w/in 5 days for shed (larger than 120 sq '?) and for being in set backs,,, also siding permit 1/31/2003 2:41:49 PM
|
BLD02-02753
| BLD-Final | 1/30/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 12:04:40. Contact: ###-####.
ok for temp occ. after trades 1/31/2003 2:57:50 PM
|
BLD02-02968
| BLD-Framing/Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | PART |
|
|
###-#### dean Sheer
ext. shear ok 1/31/2003 3:46:24 PM
|
BLD02-02969
| BLD-Framing/Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | PART |
|
|
###-#### dean sheer
ext. shear ok 1/31/2003 3:46:06 PM
|
MEC03-00250
| Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 09:52:14. Contact: ###-####.
|
MEC03-00251
| Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 09:53:14. Contact: ###-####.
|