Inspections for the day of: Wednesday, January 31, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02304 FIRE-Final Inspection1/31/20071/31/20072/1/2007 9:16:36 PMPDEFR
To be completed as scheduled on 2/2/07.
BLD05-01077 FIRE-Final Inspection1/30/20071/31/20072/1/2007 1:12:31 PMPFAIL
Missing directional arrows at the 8th floor exit signs, repair the exit sign at the pool room, missing emergency lighting at the elevator lobby and adjacent hall on the first floor.
FIR06-00749 INSP-Final Inspection1/31/20071/31/20071/31/2007 2:49:58 PMAPART
Need to properly install and adjust the tamper switch at the PIV. The remainder of fire alarm work tested satisfactory.
FIR06-00755 INSP-Sprinkler Rough-in/Hydro1/30/20071/31/20071/31/2007 2:48:04 PMPFAIL
UG fire supply line hydrostatic test failed due to excessive pressure loss.
BLD06-01044 FIRE-Final Inspection1/30/20071/31/20071/31/2007 12:52:14 PMAFAIL
Provide reliable means for maintaining a min. of 40deg. F temperature in the riser and FACP room required for these systems, keyed locking hardware at the main entry/exit must only be operable from the egress side.
FIR06-00907 INSP-Final Inspection1/30/20071/31/20071/31/2007 11:58:21 AMAPASS
Fire sprinkler corrections have been verified for completion, permit finaled.
FIR06-00558 INSP-Sprinkler Rough-in1/30/20071/31/20071/31/2007 10:54:49 AMAPART
OH sprinkler rough-in at the drop ceilings in area A as marked on approved plan set are okay to cover. Noted two overspaced heads in the play area to be relocated, also noted three heads as circled on plans are not yet completed.
FIR05-00425 INSP-Sprinkler Rough-in/Hydro1/30/20071/31/20071/31/2007 9:53:21 AMAPART
Begin 24 hr. air test of the 4th floor dry system at 49psi.@9:35 am.