BLD06-03314
| BLD-Final | 1/30/2008 | 1/31/2008 | 2/1/2008 8:26:39 AM | A | PASS |
|
|
todd Phone #: ###-####ok for temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
|
BLD07-02825
| BLD-Energy code compliance | 1/30/2008 | 1/31/2008 | 1/31/2008 5:13:08 PM | P | PASS |
|
|
erv - insulation Phone #: ###-#### ok to cover ext walls
|
BLD07-02824
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 5:12:34 PM | P | PASS |
|
|
tucker Phone #: ###-#### ok for perm occ
|
BLD07-00797
| BLD-Framing/Rough-in | 1/31/2008 | 1/31/2008 | 1/31/2008 5:12:04 PM | P | PART |
|
|
nick Phone #: ###-#### ok to cover ceiling
|
BLD07-02777
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 2:31:38 PM | P | NH |
|
|
mark Phone #: ###-####
|
BLD07-02335
| BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 1:51:13 PM | A | PART |
|
|
Linden ###-#### ok to pour ftg for column cover beam pou stairs cover wall after plb and elec oks
|
BLD07-02828
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 1:49:33 PM | P | PASS |
|
|
don Phone #: ###-#### ok fo perm occ
|
BLD07-02804
| BLD-Final | 1/29/2008 | 1/31/2008 | 1/31/2008 10:35:16 AM | A | NR |
|
|
gary Phone #: ###-#### needs elec final
|
BLD05-01559
| BLD-Final | 1/30/2008 | 1/31/2008 | 1/31/2008 10:32:24 AM | A | PASS |
|
|
Troy ###-####
|
BLD05-01559
| DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 10:31:44 AM | P | PASS |
|
|
|
BLD07-00724
| BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 10:25:57 AM | A | PASS |
|
|
mike Phone #: ###-#### stair stringer and connection engineering on and instilled ok to cover
|