Inspections for the day of: Thursday, January 31, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-03129 BLD-Framing/Rough-in1/31/20081/31/20081/31/2008 5:27:45 PMPFAIL
ray Phone #: ###-####. Needs to complete air seal package, provide truss engineering. Provide straps on bottom plates at bearing walls at kitschen drain, gas pipe at second floor. Repair studs on exterior bearing wall below washer box upstairs. do not insul. c/n posted.
BLD07-01873 BLD-Final1/31/20081/31/20081/31/2008 5:25:28 PMPPASS
Scheduled by a contractor via Hello! on 1/31/2008 at 10:16:47 AM. Contact: ###-####.
BLD07-01873 DOC - Permit Finaled1/31/20081/31/20081/31/2008 5:25:22 PMPPASS
Letter of completion issued.
BLD07-01872 BLD-Final1/31/20081/31/20081/31/2008 5:24:56 PMPPASS
Scheduled by a contractor via Hello! on 1/31/2008 at 10:14:56 AM. Contact: ###-####.
BLD07-01872 DOC - Permit Finaled1/31/20081/31/20081/31/2008 5:24:49 PMPPASS
letter of compliance issued.
BLD07-02282 BLD-Other1/30/20081/31/20081/31/2008 2:59:59 PMPPART
All clips not yet installed, still needs to wire diffuses and security camaras. Will inspect on final.
BLD06-02147 BLD-Final1/30/20081/31/20081/31/2008 2:10:36 PMPNR
tom Phone #: ###-####. Contacted Tom to inform him that he needed a code menforcement sighn off and also elec. final not complete.
BLD07-01448 BLD-Final1/31/20081/31/20081/31/2008 1:57:49 PMPPASS
sean Phone #: ###-####
BLD07-01448 DOC - Permit Finaled1/31/20081/31/20081/31/2008 1:57:49 PMPPASS
BLD07-02155 BLD-Aging Inspection1/31/20081/31/20081/31/2008 12:00:06 PM PASS
wip
BLD07-02147 BLD-Aging Inspection1/31/20081/31/20081/31/2008 11:59:50 AM PASS
wip
BLD07-01188 BLD-Framing/Rough-in1/30/20081/31/20081/31/2008 11:30:51 AMAPART
joe Phone #: ###-####. Steel stud framing for soffit at main enterance area. pend. other trades ri insp.
BLD07-03164 BLD-Framing/Rough-in1/30/20081/31/20081/31/2008 11:12:15 AMAPASS
russell Phone #: ###-####. framing for elevator shaft only. Also reviewed additional truss engineering for roof truss modifications. ok.
BLD06-02012 BLD-Final1/30/20081/31/20081/31/2008 10:27:34 AMAPASS
Scheduled by a contractor via Hello! on 1/30/2008 at 3:29:40 PM. Contact: ###-####.
BLD06-02012 DOC - Permit Finaled1/31/20081/31/20081/31/2008 10:27:25 AMPPASS
Letter of compliance issued. Verified all required signatures.
BLD07-03143 BLD-Framing/Rough-in1/31/20081/31/20081/31/2008 9:42:51 AMAPASS
Scheduled by a contractor via Hello! on 1/31/2008 at 7:05:45 AM. Contact: ###-####. Interior steel stud framed walls ok.
BLD07-02282 BLD-Other1/30/20081/31/20081/30/2008 1:46:16 PMANR
Scheduled by a contractor via Hello! on 1/30/2008 at 9:33:42 AM. Contact: ###-####. Needs code enforcement sign off prior to bldg. final.