BLD07-03129
| BLD-Framing/Rough-in | 1/31/2008 | 1/31/2008 | 1/31/2008 5:27:45 PM | P | FAIL |
|
|
ray Phone #: ###-####. Needs to complete air seal package, provide truss engineering. Provide straps on bottom plates at bearing walls at kitschen drain, gas pipe at second floor. Repair studs on exterior bearing wall below washer box upstairs. do not insul. c/n posted.
|
BLD07-01873
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 5:25:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/31/2008 at 10:16:47 AM. Contact: ###-####.
|
BLD07-01873
| DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 5:25:22 PM | P | PASS |
|
|
Letter of completion issued.
|
BLD07-01872
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 5:24:56 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/31/2008 at 10:14:56 AM. Contact: ###-####.
|
BLD07-01872
| DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 5:24:49 PM | P | PASS |
|
|
letter of compliance issued.
|
BLD07-02282
| BLD-Other | 1/30/2008 | 1/31/2008 | 1/31/2008 2:59:59 PM | P | PART |
|
|
All clips not yet installed, still needs to wire diffuses and security camaras. Will inspect on final.
|
BLD06-02147
| BLD-Final | 1/30/2008 | 1/31/2008 | 1/31/2008 2:10:36 PM | P | NR |
|
|
tom Phone #: ###-####. Contacted Tom to inform him that he needed a code menforcement sighn off and also elec. final not complete.
|
BLD07-01448
| BLD-Final | 1/31/2008 | 1/31/2008 | 1/31/2008 1:57:49 PM | P | PASS |
|
|
sean Phone #: ###-####
|
BLD07-01448
| DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 1:57:49 PM | P | PASS |
|
|
|
BLD07-02155
| BLD-Aging Inspection | 1/31/2008 | 1/31/2008 | 1/31/2008 12:00:06 PM | | PASS |
|
|
wip
|
BLD07-02147
| BLD-Aging Inspection | 1/31/2008 | 1/31/2008 | 1/31/2008 11:59:50 AM | | PASS |
|
|
wip
|
BLD07-01188
| BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 11:30:51 AM | A | PART |
|
|
joe Phone #: ###-####. Steel stud framing for soffit at main enterance area. pend. other trades ri insp.
|
BLD07-03164
| BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 11:12:15 AM | A | PASS |
|
|
russell Phone #: ###-####. framing for elevator shaft only. Also reviewed additional truss engineering for roof truss modifications. ok.
|
BLD06-02012
| BLD-Final | 1/30/2008 | 1/31/2008 | 1/31/2008 10:27:34 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/30/2008 at 3:29:40 PM. Contact: ###-####.
|
BLD06-02012
| DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 10:27:25 AM | P | PASS |
|
|
Letter of compliance issued. Verified all required signatures.
|
BLD07-03143
| BLD-Framing/Rough-in | 1/31/2008 | 1/31/2008 | 1/31/2008 9:42:51 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/31/2008 at 7:05:45 AM. Contact: ###-####. Interior steel stud framed walls ok.
|
BLD07-02282
| BLD-Other | 1/30/2008 | 1/31/2008 | 1/30/2008 1:46:16 PM | A | NR |
|
|
Scheduled by a contractor via Hello! on 1/30/2008 at 9:33:42 AM. Contact: ###-####. Needs code enforcement sign off prior to bldg. final.
|