FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 1/30/2012 | 1/31/2012 | 2/1/2012 8:00:40 AM | P | CANC |
|
|
Inspection was performed during the morning requested time slot.
|
BLD12-00087
| FIRE-Final Inspection | 1/31/2012 | 1/31/2012 | 1/31/2012 2:50:08 PM | P | PASS |
|
|
life safety passed
|
BLD11-01512
| FIRE-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 2:45:20 PM | P | PART |
|
|
A temporary occupancy is being given with Romeo Gervais permission until the kitchen area is complete. Per Sam, in plan review, the single action "paddle" hardware on the store front door from the Dining area is permissable.
|
FIR11-00612
| INSP-Sprinkler Rough-in | 1/30/2012 | 1/31/2012 | 1/31/2012 2:20:08 PM | P | PASS |
|
|
The sprinkler system rough-in passed for the Golf Galaxy and Home Fabrics canopies.
|
BLD12-00013
| FIRE-Final Inspection | 1/27/2012 | 1/31/2012 | 1/31/2012 11:33:48 AM | A | PASS |
|
|
life safety passed. The fire extinguisher is on its way from Don.
|
FIR12-00018
| INSP-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 11:08:32 AM | A | PASS |
|
|
Permit finaled
|
BLD11-00565
| FIRE-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 11:00:11 AM | A | PASS |
|
|
life safety passed
|
BLD12-00058
| FIRE-Final Inspection | 1/25/2012 | 1/31/2012 | 1/31/2012 10:59:37 AM | A | FAIL |
|
|
Repair the exit signs, provide emergency lighting in the Display area, remove hardware from the northwest store front door, provide racking permit for the storage racks that exceed 8' (racks are 12'), provide high pile storage permit, it appears that pendant sprinklers are overspaced in two locations in the Display area (product is 15' piled, 19' on the racks).
|
BLD12-00122
| FIRE-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 10:55:45 AM | A | PART |
|
|
A temporary was given until the front and rear door hardware is corrected and the address is moved to the front of the building.
|
FIR12-00018
| INSP-Sprinkler Rough-in/Hydro | 1/30/2012 | 1/31/2012 | 1/31/2012 9:30:29 AM | A | PASS |
|
|
The sprinkler piping rough-in and hydro test passed.
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 1/30/2012 | 1/31/2012 | 1/31/2012 9:02:11 AM | A | PASS |
|
|
The second floor west end piping can be covered. See the city approved plans for locations marked in red. I noted that insulation/tenting over the fourth floor corridor piping has been removed in several locations.
|
FIR09-00680
| INSP-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 9:00:36 AM | A | PASS |
|
|
Permit finaled
|