ESC11-00879
| General Inspection | 1/30/2012 | 1/31/2012 | 2/1/2012 3:02:42 PM | P | FAIL |
|
|
Verbal to RP: Stabilized the access at the top of the project off of Clubview. Must have it stabilized prior to activity on project starting up agian.
|
ESC11-00870
| Site Preparation | 1/30/2012 | 1/31/2012 | 2/1/2012 9:05:21 AM | A | PART |
|
|
Notified the Contractor (Jerry Wright) that he must remove all temporary BMP's and initiate stabilization measures as soon as practicable. Will follow up as soon as a date of hyrolic application will be initiated.
|
ESC11-00718
| BMP Violation | 1/31/2012 | 1/31/2012 | 1/31/2012 9:03:04 AM | A | FAIL |
|
|
Verbal Correction to RP: Clean up all concrete washout residual and provide a washout lined with a 10 mil poly liner. Will re-inspect on 2/2/2012
|
ESC11-00812
| Tracking Control | 1/31/2012 | 1/31/2012 | 1/31/2012 8:29:21 AM | A | FAIL |
|
|
Message to RP: Clean up tracked sediment from the washout area in the back of lot. Will re-inspect on 2/1/2012am.
|