FIR13-00035
| INSP-Sprinkler Rough-in | 1/31/2013 | 1/31/2013 | 1/31/2013 3:28:14 PM | P | PASS |
|
|
Rough-in passed. Sprinkler piping is ok to cover.
|
BLD12-00551
| FIRE-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 3:11:48 PM | P | PART |
|
|
A temporary occupancy is being given with Jim sly's and Jason Blais permission until the rest of theconstruction has been completed.. New sprinkler and fire alarm permits will be required.
|
FIR12-00365
| INSP-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 3:08:09 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00428
| INSP-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 3:07:22 PM | P | PASS |
|
|
Permit finaled
|
BLD12-02789
| FIRE-Conference | 1/30/2013 | 1/31/2013 | 1/31/2013 3:05:48 PM | A | PASS |
|
|
I finished the life safety inspection. Life safety can be signed off when the project related fire alarm permit is finaled.
|
BLD13-00087
| FIRE-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 2:44:22 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00003
| INSP-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 1:28:57 PM | P | FAIL |
|
|
No ceiling tile has been installed yet.
|
BLD12-00687
| FIRE-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 1:24:59 PM | P | PART |
|
|
A temporary occupancy is being given with scott arellano's permission until the project related fire alarm has been completed with plan modifications. Building inspector to please verifiy breeze way doors close for fire rated assembly. This work was not yet complete.
|
FIR13-00027
| INSP-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 10:13:53 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00679
| INSP-Conference | 1/30/2013 | 1/31/2013 | 1/31/2013 10:13:10 AM | A | DONE |
|
|
Don requested that the FDC be moved from the 15th street side of th building to the north side alley. I contacted Tim Frost and it was determined that the FDC needs to remain on the 15th street side of the building but could be moved down the wall alittle.
|
FIR12-00587
| INSP-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 10:10:47 AM | A | FAIL |
|
|
Provide city approved plan, provide correct orfice for the test connection, provide head box with extra heads/wrench, provie service tag, test bell and remove the handles from the backflow.
|