ESC13-00480
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 2:05:31 PM | | PASS |
|
|
Smoke Ranch and Goldking being kept clean. No corrections for Union Square at this time.
|
ESC13-01265
| Site Preparation | 1/31/2014 | 1/31/2014 | 1/31/2014 1:55:17 PM | P | PASS |
|
|
rescheduled from AM. James # ###-####
This house is Boise School District vocational project. Met teacher/RP James onsite with class and reviewed BMPs and daily housekeeping duties, and purpose of erosion control.
Ready for construction.
|
ESC13-01159
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 1:30:11 PM | | PASS |
|
|
No activity. Emailed RP to get a new projected start date and to remind about ESC site prep inspection.
|
ESC11-00732
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 12:06:34 PM | | PASS |
|
|
Finaled.
|
ESC11-00732
| DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 12:06:20 PM | P | PASS |
|
|
Greenbelt realignment is complete and shoulders stabilized. Some remaining area of disturbance will be stabilized under the ESC permit for the Barber trunk - as discussed with Boise PW contact Mike Shepard. No further ESC inspections required for this project.
|
ESC14-00012
| Site Preparation | 1/31/2014 | 1/31/2014 | 1/31/2014 10:56:30 AM | P | PASS |
|
|
JOHN Phone #: ###-####
RP on-site. Permit was ready but was not picked up before excavation on 1/30. Issued warning about site prep inspections. BMPs are installed including fresh construction entrance. Other Siedl homesites in compliance. Approved.
|
ESC13-00611
| Aging Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 10:41:46 AM | | PASS |
|
|
Finaled.
|
ESC13-00611
| DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 10:41:27 AM | P | PASS |
|
|
Home is complete, landscaped, and occupied. BLD permits finaled. ESC conditions satisfied.
|
ESC13-00627
| Aging Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 10:39:03 AM | | PASS |
|
|
Finaled.
|
ESC13-00627
| DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 10:38:47 AM | P | PASS |
|
|
Home is complete and landscaped. BLD permit finaled. Now being used as a model home for Tahoe Homes. ESC conditions satisfied.
|
ESC13-00349
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 10:22:03 AM | | PASS |
|
|
STaging area is still in process of stabilization and is fence off. Tennis courts almost complete. No activity at time of inspection but looks like the are placing curbing around edge of courts. No corrections required.
|
ESC12-00909
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 9:44:39 AM | | PASS |
|
|
Finaled.
|
ESC12-00909
| DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 9:43:06 AM | P | PASS |
|
|
New garage is open and in use. The south and west sides which were disturbed are now landscaped and stabilized. BMPs have been removed. No further ESC inspections necessary. BLD permit is still.
|
ESC13-01265
| Site Preparation | 1/30/2014 | 1/31/2014 | 1/31/2014 8:52:48 AM | A | NR |
|
|
James Phone #: ###-####
Called RP to schedule, he is unable to meet until 1:40 PM. Site prep rescheduled.
|
ESC13-00340
| General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 8:41:35 AM | | PASS |
|
|
Earthwork and utility trenching through existing parking lot is complete. No trackout, discharges, or other violations observed
|