FIR17-00021
| INSP-Alarm Testing | 1/31/2017 | 1/31/2017 | 1/31/2017 2:59:38 PM | P | DONE |
|
|
Permit can be finaled when scheduled as a final
|
FIR16-00603
| INSP-Alarm Testing | 1/31/2017 | 1/31/2017 | 1/31/2017 2:58:43 PM | P | DONE |
|
|
Permit can be finaled when scheduled as a final
|
FIR16-00284
| INSP-Sprinkler Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 9:40:55 AM | A | PASS |
|
|
This was a re-inspection for Apartment 103. The two pendant heads have been fixed.
|
FIR16-00644
| INSP-Sprinkler Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 8:29:54 AM | A | PART |
|
|
Remaining piping can be covered. High temp heads need to be installed infront of the unit heaters as per table 8.3.2.5(a)
|