Inspections for the day of: Thursday, January 31, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01929 Final1/31/20191/31/20191/31/2019 2:16:48 PMPNH
Phone #: ###-#### Inspection requested via web by Alan Lusk
All areas locked. Unit 4 looks lived in. Reschedule when accessible.
ELE19-00391 Permanent Service1/30/20191/31/20191/31/2019 1:56:43 PMPPASS
There is a lock box on the back door if you need to get access with a code of 6737. Phone #: ###-#### Inspection requested via web by Jason Scott
For final equipment grounding conductor to sub-panel shall be of sufficient size as per 250.122 #8 copper, #10 installed.
p/s o/h rec ok
ELE18-04314 Final1/31/20191/31/20191/31/2019 1:16:40 PMPFAIL
Von. Phone #: ###-#### Inspection requested via web by Sean DeLacy
110.22- Each disconnecting means shall be identified as to its purpose.
Secure panel cover right next to new service.
ELE18-04779 Rough-In Permanent Service1/30/20191/31/20191/31/2019 11:38:10 AMAPASS
New construction it''s open Phone #: ###-#### Inspection requested via web by Clayton Morgan
Rough in ok cover p/s u/g n ok
ELE19-00371 Electrical Rough-In1/30/20191/31/20191/31/2019 10:59:54 AMAPASS
Underground cover Phone #: ###-#### Inspection requested via web by Shane Lott
Southside aprox 30' from in ground box towards Rossi underground rough in ok cover
ELE18-00763 Final1/30/20191/31/20191/31/2019 10:39:54 AMAFAIL
Please call for access Phone #: ###-#### Inspection requested via web by John VanZandt 210.8(A)(1)- All receptacles installed to serve bathroom basins shall have GFCI protection. All basement bathroom receptacles.
210.8(A)(2)- All 15 and 20 amp 120 volt receptacle outlets installed in a garage shall have GFCI protection. Receptacle located on warm wall.
210.52(C)- In kitchens, pantries, and similar areas receptacle outlets installed to serve counter top surfaces shall be installed so no point measured along wall line is more than 24" from a receptacle.
250.122- Minimum equipment grounding conductor for a 30 amp circuit shall not be smaller than #10. #12 installed in AC whip.
ELE19-00341 Permanent Service1/30/20191/31/20191/31/2019 9:25:31 AMAPASS
Service Inspection Phone #: ###-#### Inspection requested via web by Kevin Perez
p/s o/h rec ok
ELE19-00340 Temporary Service1/30/20191/31/20191/31/2019 8:54:10 AMAPASS
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok