MEC18-05550
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 4:17:15 PM | P | PASS |
|
|
Tim Phone #: ###-####- a/c only co ok
|
MEC19-00392
| Final | 1/28/2019 | 1/31/2019 | 1/31/2019 3:39:17 PM | P | PASS |
|
|
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg- electric air handler with electric heat assist heat pump ok
|
MEC19-00453
| Pressure Test | 1/31/2019 | 1/31/2019 | 1/31/2019 3:07:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- 20lb gas pass from meter to furnace location- tagged gas line at meter location
|
MEC19-00439
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 2:31:09 PM | P | PASS |
|
|
need pressure test on flu vent want inspection late as possible call Jeff ###-#### Phone #: ###-#### Inspection requested via web by Kim Lithander- furnace a/c coil co ok- 5lb flue test pass
|
MEC19-00446
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 1:38:34 PM | P | PASS |
|
|
Call ahead // Barb Phone #: ###-####- moved 2 supply lines into new room addition- final ok
|
MEC18-05917
| Conference | 1/30/2019 | 1/31/2019 | 1/31/2019 11:30:16 AM | A | DONE |
|
|
please call dru 1 hr in advance so all parties can be in attendance for insulation questions. Phone #: ###-#### Inspection requested via web by Nicholas Paige- conference to discuss IECC insulation requirements- all supply, return air and outside air will need to be insulated per IECC 2015 C403.9-
|
MEC19-00413
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 10:39:13 AM | A | PASS |
|
|
Access to mechanical room in back of building. Lock box 4848 Phone #: ###-#### Inspection requested via web by Michael Stimpson- furnace a/c coil ok
|
MEC19-00399
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 10:17:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace in crawl co ok
|
MEC19-00382
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 9:44:37 AM | A | FAIL |
|
|
PLEASE CALL STERLING WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace a/c coil co ok- bubble wrap insulation needs 3/4" air gap per installation instructions to maintain R-6 value whats installed on meets R-4.2- talked with steve about this by phone
|
MEC18-04798
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 9:14:39 AM | A | FAIL |
|
|
Client will be at location at 9am. Please call prior to arrival at ###-#### Thank you Inspection requested via web by Andrea Grigsby- furnace a/c coil co ok- flue from furnace needs grade has sag
|
MEC17-05004
| Mec-Aging Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 8:42:37 AM | | FAIL |
|
|
needs inspection called in
|
MEC17-05015
| Mec-Aging Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 8:42:16 AM | | FAIL |
|
|
conttractor needs to schedule final inspection
|
MEC17-05018
| Mec-Aging Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 8:41:42 AM | | FAIL |
|
|
contractor needs to schedule final inspection
|
MEC19-00451
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 8:21:43 AM | P | CANC |
|
|
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
|