ELE18-03546
| Final | 1/30/2019 | 1/31/2019 | 1/31/2019 2:30:05 PM | P | PASS |
|
|
There is a lock box just to the right of the front door with a code of 1952. The key will also get you access to the garage. Phone #: ###-#### Inspection requested via web by Jason Scott Ok final
|
ELE18-03641
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 2:01:19 PM | P | PASS |
|
|
garage code 2018 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final.
|
ELE18-03835
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 2:00:57 PM | P | PASS |
|
|
can this one be finaled?.. Tony #415,, ###-#### Ok final. Looked at house prior and already finaled.
|
ELE19-00305
| Electrical Rough-In | 1/31/2019 | 1/31/2019 | 1/31/2019 1:37:19 PM | P | PASS |
|
|
Call half hour before to meet // Mark Phone #: ###-#### Ok cover. Water bond confirmed, hot cold bonded, all boxes have grd screws.
|
ELE19-00404
| Conference | 1/31/2019 | 1/31/2019 | 1/31/2019 1:36:27 PM | P | DONE |
|
|
Mich Phone #: ###-#### Discussed overhead feeder to detached garage a long with equipt grd sized to 250.122.
|
ELE17-01399
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 11:32:00 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Contractor is going to contact homeowner and coordinate a time.
|
ELE16-03779
| Temporary Service | 1/31/2019 | 1/31/2019 | 1/31/2019 11:31:26 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Contractor is going to contact homeowner and coordinate a time.
|
ELE16-00568
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 11:07:56 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final for added smoke detectors.
|
ELE19-00380
| Electrical Rough-In | 1/30/2019 | 1/31/2019 | 1/31/2019 10:47:50 AM | A | PASS |
|
|
Basement rough in Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover basement.
|
ELE19-00387
| Final | 1/31/2019 | 1/31/2019 | 1/31/2019 10:38:11 AM | P | PASS |
|
|
Stuart ###-####. Cancelled RI inspection. Not needed. Ok final. Brkr size 25a max fuse verified, #10 cu. All WP fittings. Ok final. Looked at in AM.
|
ELE18-02078
| Final | 1/24/2019 | 1/31/2019 | 1/31/2019 10:37:24 AM | A | NR |
|
|
Call 15 minutes ahead // Jill Phone #: ###-#### Going to schedule for next week.
|
ELE19-00387
| Electrical Rough-In | 1/30/2019 | 1/31/2019 | 1/31/2019 10:22:19 AM | A | CANC |
|
|
Added AC Please Final Phone #: ###-#### Inspection requested via web by Stuart Welton Added final and cancelled RI.
|
ELE19-00309
| Rough-In Permanent Service | 1/30/2019 | 1/31/2019 | 1/31/2019 10:10:15 AM | A | PASS |
|
|
South west unit Phone #: ###-#### Inspection requested via web by Greg Idsinga p/s o/h n ok
|
ELE19-00385
| Temporary Service | 1/30/2019 | 1/31/2019 | 1/31/2019 9:28:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s o/h n ok
|
ELE19-00031
| Electrical Rough-In | 1/30/2019 | 1/31/2019 | 1/31/2019 9:08:43 AM | A | PASS |
|
|
Rough walls so the general can insulate and sheet rock. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover walls W side of building and 2 baths.
|