ELE20-00289
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 3:13:56 PM | P | PASS |
|
|
Robert Phone #: ###-#### Ok final. 15a max fuse, 15a brkr installed.
|
ELE19-03623
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 2:49:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Ok final.
|
ELE20-00355
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 2:00:31 PM | P | PASS |
|
|
inspection for relocating the power to A/C. Please call Kelly@ ###-#### when in route so we can meet you there. Thank you Phone #: ###-#### Inspection requested via web by Kelly Felin Ok final. 25a max fuse, 25a brkr installed, service recept installed
|
ELE19-04532
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 1:39:01 PM | P | PASS |
|
|
master bath. Go thru side gate. Phone #: ###-#### Inspection requested via web by David McClellan Ok final
|
ELE20-00068
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 1:03:24 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Panel needs labeled
|
ELE19-02591
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 12:59:45 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins Rescheduled for 2/4
|
ELE19-03586
| Electrical Rough-In | 1/30/2020 | 1/31/2020 | 1/31/2020 12:02:02 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Hidajet Zahic Ok cover upper level. 1 recept will be needed to right of sliding door on final.
|
ELE19-04719
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 11:31:30 AM | A | PASS |
|
|
John Phone #: ###-#### call first to check on floor covering complete Ok final.
|
ELE19-01582
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 11:09:42 AM | A | FAIL |
|
|
Final inspection please contact Shannon on site Phone #: ###-#### Inspection requested via web by Deb Morton 1. Circuits B1-6, 14, 17, 20, 28 and 39 need GFI protection. 2. Doors for refers on S side need installed so wiring can be completed. Open junction boxes at this time. I did not get on roof to check RTU's, or open fuel dispensers in front.
|
ELE19-00561
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 10:15:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins Final to close permit. Went and looked at location, sign is not an illuminated sign. Talked to contractor, he seems to think the city wouldnt allow a sign because of historical reasons.
|
ELE19-04867
| Final | 1/24/2020 | 1/31/2020 | 1/31/2020 10:09:50 AM | A | NH |
|
|
call for access- Danny Phone #: ###-#### Talked to homeowner, he is out of town. He gave me door code and said sometimes it wont work. Tried multiple times to open door, no luck.
|
ELE20-00067
| Electrical Rough-In | 1/29/2020 | 1/31/2020 | 1/31/2020 9:54:35 AM | A | PASS |
|
|
Please contact Jeremiah 208 631 5156 Phone #: ###-#### Inspection requested via web by Scott Campbell Ok cover 2 locker rooms and janitor. Walls and ceiling. Junction boxes will be in ceilings, access panels will be available as ceilings are hardlid.
|
ELE20-00357
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 9:40:42 AM | A | FAIL |
|
|
Please call Paul about 1/2 hour before heading toward the job so I can gain access. Phone #: ###-#### Inspection requested via web by PAUL PINNEY Talked with Paul about moving panel to the left to gain clearance from in front of trrans. Will call back in next week.
|
ELE19-04646
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 8:55:53 AM | A | CANC |
|
|
Please call in advance to ensure access. Phone #: ###-#### Inspection requested via web by Casey Fouts Talked to Casey, wrong job called in
|
ELE19-02910
| Electrical Rough-In | 1/30/2020 | 1/31/2020 | 1/31/2020 8:21:06 AM | A | PASS |
|
|
Please inspect floor heat install. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover flr heat mstr and small bath W side.
|
ELE20-00355
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 6:21:00 AM | A | CANC |
|
|
relocate power for A/C ready for final. Thank you Phone #: ###-#### >> Inspection requested via web by Kelly Felin Inspection cancelled from web by: Kelly Felin
|
ELE16-04136
| ELE-Aging Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 5:24:41 AM | | DONE |
|
|
Homeowner pulled permit to finish work. ELE19-04659
|
ELE16-04136
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 5:23:54 AM | A | DONE |
|
|
Ok final. Homeowner pulled his own permit to finish work. Permit # ele19-04659.
|