ELE20-00377
| Conference | 1/31/2020 | 1/31/2020 | 1/31/2020 3:49:23 PM | P | PASS |
|
|
Existing wiring very messy, and I need to know how much I have to make right. Phone #: ###-#### Inspection requested via web by Dan Hilke.... discussed existing wiring at house service change is required to satisy what homeowner is wanting...existing 2 sub panels need attention...interior home panel is 3 wire and garage panel is overloading main service-125A max rating at main service panel...contractor to down size breaker at main service feeding added exterior sub panel that contractor added trying to clean up main service...grounding will be brought up to code by second ground rod when changing service to 200A all-in-one...future work will require future rough/perm service/final inspections...this was conference only
|
ELE19-04849
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 2:43:04 PM | P | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by David Feller...ok to final
|
ELE20-00360
| Final | 1/31/2020 | 1/31/2020 | 1/31/2020 2:15:26 PM | P | PASS |
|
|
ok to final...same size panel installed...existing o/h riser and meter staying...just new service panel installed...labelling complete
|
ELE20-00360
| Permanent Service | 1/31/2020 | 1/31/2020 | 1/31/2020 2:11:41 PM | P | PASS |
|
|
contact name Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden... p/s o/h reconnect ok
|
ELE20-00360
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 2:03:20 PM | P | CANC |
|
|
contact name Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden...should of been perm service inspection...final inspection will be required once power is restored
|
ELE20-00254
| Permanent Service | 1/28/2020 | 1/31/2020 | 1/31/2020 1:49:04 PM | P | PASS |
|
|
Idaho Power will shut down at 9am for service upgrade, Please call to confirm that install is complete for inspection/Service energize. Thanks Phone #: ###-#### Inspection requested via web by Kory Peterson...p/s u/g reconnect ok..will need to climb pole for reconnect
|
ELE19-04698
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 1:07:14 PM | A | PASS |
|
|
garage code 2468, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn...ok to final
|
ELE19-02004
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 12:54:33 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins...reschudeled to following Monday do to time constraints and lack of inspectors
|
ELE19-00324
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 12:52:32 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins...rescheduled to following Monday do to time constraints and lack of inspectors
|
ELE19-00479
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 12:50:45 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins...rescheduled to following Monday do to time constraints and lack of inspectors
|
ELE19-00964
| Final | 1/30/2020 | 1/31/2020 | 1/31/2020 12:48:03 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris hopkins...rescheduled to following monday...do to time constraints and lack of inspectors
|