FIR19-00559
| INSP-Final Inspection | 1/28/2020 | 1/31/2020 | 1/31/2020 3:18:12 PM | P | PASS |
|
|
Final fire alarm inspection for scope of work is complete.
Phone #: ###-#### Inspection requested via web by Neal Timmerman
|
FIR15-00122
| INSP-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 3:17:42 PM | P | PASS |
|
|
Final inspection was completed by Lee Meridith on 06APR2015, permit is finaled.
|
BLD19-03650
| FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 2:32:22 PM | P | PASS |
|
|
Permenant doors have been installed, final life fire safety inspection for scope of work is complete.
David Phone #: ###-####
|
BLD19-04225
| FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 12:23:52 PM | P | PART |
|
|
Partial final inspection for life fire safety complete, a minor fire alarm modification was required, hotel fire panel is what provides notification to the fire alarms in area of work, fire alarm inspection for the 1 strobe addition will be completed on 05FEB2020. No fire sprinkler modifications, fire extinguishers are placed with current inspection tags. TCO authorized for 14 days per conversation with Joe Bruce, Fire Section Supervisor. After fire alarm inspection is inspected and finaled this permit can be signed off for life fire safety. Chest freezer will be relocated as discussed.
Justin Phone #: ###-####
|
BLD19-04672
| FIRE-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 12:14:50 PM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work complete, signatures provided on permit sign off card.
Angie Phone #: ###-####
|
BLD19-01828
| FIRE-Conference | 1/31/2020 | 1/31/2020 | 1/31/2020 11:48:01 AM | A | DONE |
|
|
Spoke with GC about level 4 insulation for sprinkler piping. According to the GC the roof has an insulation value of R-30, as shown on the city approved fire sprinkler drawings a minimum of R-38 is required, more insulation will need to be provided and installed per detail on the fire sprinkler approved drawings. Cover will not be authorized on the level 4 fire sprinkler piping until a minimum combined value of R-38 is provided.
|
FIR19-00702
| INSP-Sprinkler Rough-in | 1/31/2020 | 1/31/2020 | 1/31/2020 11:42:35 AM | A | PART |
|
|
Rough to cover inspection for levels 1, 2 and 3 complete, levels 1,2 and 3 suite rooms approved for cover, city approved plans are notated with red ink areas approved for cover, corridor heads to be cut in after ceiling grid is installed. Rough in inspection for level 4 complete, tenting not installed at time of inspection. According to GC the roof has an R-30 rating, as shown on city approved drawings R-38 is minimum R value to be compliant with approved drawings, cover is not approved for level 4.
1st, 3rd, 4th floor rough/tenting. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-03423
| FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 10:41:01 AM | P | PASS |
|
|
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Erik Phone #: ###-####
|
FIR19-00874
| INSP-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 10:38:45 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00873
| INSP-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 10:38:26 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00861
| INSP-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 10:38:04 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00932
| INSP-Final Inspection | 1/28/2020 | 1/31/2020 | 1/31/2020 9:57:18 AM | A | PART |
|
|
Fire alarm inspection is compliant with NFPA72, as-builts need to be submitted, approved and fees paid before permit can be finaled.
Please start Final at 9:30 as this system is connected to the Hampton Inn hotel and it can''t go off past 10:00 AM. Eric will be on site. Phone #: ###-#### Inspection requested via web by Fire Scheduler
|
FIR19-00934
| INSP-Final Inspection | 1/28/2020 | 1/31/2020 | 1/31/2020 8:56:49 AM | A | FAIL |
|
|
Inspection request was not coordinated with inspector, start time for inspector is 8AM unless approved by the fire section supervisor for a 7AM inspection time, as stated before on past inspections, 7AM inspection time needs to be coordinated with the inspector and approved by the fire section supervisor per notification to the fire section supervisor by the inspector.
Building is occupied - 7 am schedule Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00858
| INSP-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 8:50:33 AM | A | PART |
|
|
Final fire alarm inspection for area of work has been completed, as-builts to be sent in for in duct smoke detector relocations as well as device address changes. Permit can be signed off as finaled after as-builts are received, approved and fees are paid.
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
FIR19-00841
| INSP-Final Inspection | 1/29/2020 | 1/31/2020 | 1/31/2020 8:49:05 AM | A | PASS |
|
|
Final hood suppression system inspection complete.
Phone #: 2084777315 >> Inspection requested via mobile web by Matt Robison
|
FIR19-00842
| INSP-Final Inspection | 1/29/2020 | 1/31/2020 | 1/31/2020 8:48:13 AM | A | PASS |
|
|
Final hood suppression system inspection complete.
Phone #: 2084777315 >> Inspection requested via mobile web by Matt Robison
|