Inspections for the day of: Thursday, January 4, 1996.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-00034 INSP - Gas log/ Fireplace1/4/19961/4/19961/4/1996 12:00:00 AM NR
/ / 337 - RFC -REINSPECTION FEE CHARGED NOT READY
MEC95-01637 INSP - Final1/3/19961/4/19961/4/1996 12:00:00 AMAPASS
01/03/96 337 - FNL -OK FINAL sign perm occ
MEC95-01637 INSP - Final1/3/19961/4/19961/4/1996 12:00:00 AMAPASS
01/03/96 337 - FNL -OK FINAL sign perm occ
MEC95-02279 INSP - Gas pressure test1/3/19961/4/19961/4/1996 12:00:00 AMAPART
01/03/96 337 - REINSPECTION RFC -REINSPECTION FEE CHARGED GAS TEST STILL FAIL R/I OK
MEC96-00032 INSP - Gas log/ Fireplace1/3/19961/4/19961/4/1996 12:00:00 AMAPASS
01/03/96 337 - FNL -OK FINAL
MEC96-00036 INSP - Framing/ Rough-in1/4/19961/4/19961/4/1996 12:00:00 AMPNR
01/04/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NOT READY
MEC96-00038 INSP - Rough-in & Gas Pressure1/4/19961/4/19961/4/1996 12:00:00 AMPPASS
01/04/96 337 - GP -OK GAS PIPING RGHN-OK ROUGH
MEC96-00041 INSP - Rough-in & Gas Pressure1/4/19961/4/19961/4/1996 12:00:00 AMPFAIL
01/04/96 337 - COMPLETE HVAC SYSTEM AS PER PLANS AND SPECS ALL RELATED G VENTING-$7,197.00-BLD 95-0404 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC95-00683 INSP - Gas pressure test1/4/19961/4/19961/4/1996 12:00:00 AMPPASS
01/04/96 337 - DAVE-SKIP CALL AND NEEDS THIS AS EARLY PM AS POSSIBLE FNL -OK FINAL
MEC95-01038 INSP - Framing/ Rough-in1/4/19961/4/19961/4/1996 12:00:00 AMPFAIL
01/04/96 337 - BASEMENT CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC95-01074 INSP - Gas log/ Fireplace1/4/19961/4/19961/4/1996 12:00:00 AMPPASS
01/04/96 337 - FIREPLACE NOT SIGNED OFF YET FNL -OK FINAL