MEC99-04385
| Final | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | PART |
|
|
doug ###-####. P/T ok- no address numbers.
|
BLD99-03434
| BLD-Framing/Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | PASS |
|
|
###-#### Wade
|
MEC99-04357
| Rough-in | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 07:31:18. Contact: ###-####. Frplc. draftstop too low, ck frplc. flue chase when done.
|
BLD99-01098
| BLD-Framing/Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 10:31:40. Contact: ###-####. Truss engineering.
|