MEC99-02969
| Final | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | FAIL |
|
|
###-####--larry --re-insp fn --. Combustion air source, insulate, condensate drain.
|
MEC99-03711
| Final | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | PASS |
|
|
russ ###-####
|
BLD99-03012
| BLD-Final | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | FAIL |
|
|
###-####--BRIAN FN. Need other inspection, plumbing- electrical.
|
MEC99-04340
| Pressure Test | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 16:09:04. Contact: ###-####.
|
MEC99-04340
| Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 16:09:17. Contact: ###-####.
|
BLD99-02386
| BLD-Final | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 07:21:34. Contact: ###-####.
|
BLD99-02374
| BLD-Final | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 07:22:55. Contact: ###-####.
|
BLD99-01896
| BLD-Final | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 08:01:18. Contact: .
|
BLD99-03125
| BLD-Wall cover | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 08:02:23. Contact: .
|
BLD99-03269
| BLD-Framing/Rough-in | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | FAIL |
|
|
TED--CALL 1ST BEFORE INSP- ###-#### R/I. Posted corrections.
|
BLD99-02687
| BLD-Final | 1/4/2000 | 1/4/2000 | 1/4/2000 12:00:00 AM | P | FAIL |
|
|
JOHN ###-#### FN OCC--KEY OVER FRONT DOOR FOR ACCESS. Attic insulation required.
|