PLM00-04412
| Plumbing Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 1/3/2001 4:42:51 PM colverdale 9:30 or so ###-####
1/3/2001 4:43:32 PM restroom area s.s. in crawl no grease line yet 1/4/2001 10:48:52 AM
|
PLM00-03432
| Final | 1/4/2001 | 1/4/2001 | 1/4/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 08:17:54. Contact: ###-####.
|
PLM99-03767
| Final | 1/4/2001 | 1/4/2001 | 1/4/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 09:10:58. Contact: ###-####.
|
PLM99-03500
| Final | 1/4/2001 | 1/4/2001 | 1/4/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 09:11:59. Contact: ###-####. pipe t&p drain 1/4/2001 3:15:19 PM
|
PLM99-02892
| Final | 1/4/2001 | 1/4/2001 | 1/4/2001 12:00:00 AM | P | FAIL |
|
|
fn masco steve ###-#### flush all sewer mains 1/4/2001 3:13:51 PM ###-#### 1/4/2001 3:31:17 PM
|