BLD01-02770
| BLD-Framing/Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-#### roof trusses at loft lower landing bearing wall need truss engineering and load path for floor sys. support. 1/4/2002 10:37:58 AM
|
MEC01-03661
| Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 14:11:22. Contact: ###-####. c/n made ok. 1/4/2002 10:53:59 AM
|
BLD00-02920
| BLD-Conference | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-#### e 1st fl. restarooms,lockerrm/synthesis rm and clean bench ok for temp occ. 1/7/2002 9:36:10 AM
|
MEC01-03813
| Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 1/4/2002 9:02:47 AM dixi approved gas line r/i ok
|
BLD01-02923
| BLD-Framing/Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
###-#### framing ok 1/4/2002 2:31:40 PM
|
BLD01-01408
| BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 09:07:41. Contact: ###-####. l/c ok final. 1/4/2002 4:47:34 PM
|
BLD01-00654
| BLD-Framing/Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 09:48:21. Contact: ###-####. via called to canc. 1/4/2002 1:53:09 PM
|
BLD01-02413
| BLD-Concrete | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-01646
| BLD-Framing/Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
###-#### office and storage areas ok to rock. 1/4/2002 2:53:16 PM
|