PLM01-03451
| PLM-Aging Inspection | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | | NR |
|
|
no calls for inspection 1/4/2002 10:18:37 AM
|
PLM01-03445
| PLM-Aging Inspection | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | | NR |
|
|
no calls for inspection 1/4/2002 10:19:13 AM
|
PLM01-03742
| Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-#### temp occ ok set all equipment 1/4/2002 9:51:02 AM
|
PLM01-03664
| Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-#### just looked at the kitchen sink, leave this permit open untill the bathroom is complete 1/4/2002 10:17:34 AM
|
PLM01-03592
| Med/Gas Systems | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 1/3/2002 1:30:19 PM med gas 24hr test med gas pressure test ok 1/4/2002 11:38:45 AM
|
PLM02-00021
| Plumbing Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 08:45:27. Contact: ###-####.
|
PLM02-00019
| Plumbing Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 08:46:42. Contact: ###-####.
|
PLM01-04162
| Water and/or Sewer | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
water line water loine and dcva ok to cover, dcva needs testing 1/4/2002 2:31:46 PM
|
PLM01-03819
| Final | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
###-#### 1/4/2002 3:10:17 PM final ok with water heater relief termination turned down 1/4/2002 3:10:51 PM
|
PLM01-00605
| Plumbing Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
###-#### ri ok with water service hung, foot vent c.o.'s in the vertical 1/4/2002 1:49:19 PM
|
PLM02-00036
| Water and/or Sewer | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PASS |
|
|
###-####
|