BLD01-02264
| BLD-Framing/Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | NR |
|
|
CEILING\###-####...need elec prior to tiles. 1/4/2002 10:39:23 AM
|
MEC01-03407
| Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PASS |
|
|
OPEN
|
BLD98-03705
| BLD-Concrete | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 1/4/2002 12:07:40 PM met w/ Alan G.& MTI at site,c/n: need eng's approval of caisson soils brg tests & clarify if control need for heat at 2800 yd. mat. Crane/auger for caissons being removed
|
BLD01-02414
| BLD-Conference | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 1/4/2002 2:27:30 PM w/ pete re masonry; take photos
|
BLD01-00606
| BLD-Energy code compliance | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 1/4/2002 5:20:32 PM 1st, 2nd fl ok
|
BLD01-03206
| BLD-Foundation | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
###-####; note, there appears to have been an irrigation lateral running to adjacent property to south. 1/4/2002 5:18:40 PM
|
BLD01-03203
| BLD-Foundation | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
###-#### hd's, steel in 1/4/2002 5:06:03 PM
|
BLD01-02414
| BLD-Concrete | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
PETE ###-####, block in place, need detail onsite to verify steel. 1/4/2002 5:04:04 PM
|
BLD96-02171
| BLD-Final | 1/4/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 10:46:58. Contact: ###-####. recall. 1/4/2002 2:16:16 PM
|