BLD01-03203
| BLD-Footing | 1/2/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-####
|
BLD01-02348
| BLD-Energy code compliance | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-####. Ok to sheetrock upper floor only basement needs fire blocking, c/n posted. 1/4/2002 12:44:28 PM
|
BLD01-02885
| BLD-Energy code compliance | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-#### Ok to sheetrock upper area only basement needs fire blocking c/n posetd. 1/4/2002 12:45:02 PM
|
BLD01-03206
| BLD-Footing | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PART |
|
|
###-####
|
MEC01-02893
| Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 16:52:47. Contact: ###-####. C/n posted fire/protection at 1 hour ceiling assembly. 1/4/2002 11:14:17 AM
|
MEC01-02893
| Pressure Test | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 16:53:17. Contact: ###-####. pt high and low at inter guage ok. 1/4/2002 11:13:38 AM
|
BLD01-00308
| BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
went over items will be back 1/7/02 for another inspection and will leave c/n . 1/4/2002 4:49:09 PM
|
BLD01-02286
| BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 12:11:20. Contact: ###-####.Went over requirements for final need health dpt and fire/life safety, Mec and Bld can be done at same time . 1/4/2002 4:50:06 PM
|
BLD00-02504
| BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 12:12:43. Contact: ###-####.went over items for final see bld01-2286. 1/4/2002 4:51:01 PM
|