FIR04-00622
| INSP-Final Inspection | 1/3/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | A | PASS |
|
|
Contact: Jim Danes; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Installed per plans in office area; 1/4/2005 12:08:07 PM
|
BLD04-02788
| FIRE-Conference | 1/3/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | A | PART |
|
|
richard ###-#### call 1st before insp MEt with GC about final - need shell signed off; verify HVAC for duct detector if required; exit sign not needed at door in hallway (approved plans show sign on one side and his plans show on the other side) 1/4/2005 12:07:34 PM
|
FIR04-00448
| INSP-Sprinkler Rough-in/Hydro | 1/3/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | P | PART |
|
|
1:00 pm; will need to check flows for alarms at fire panel R/I okay; will need to complete dry uprights for final; UG will need heat per resubmittals; need resubmittals for changes to riser and racking 1/4/2005 2:48:19 PM
|
BLD04-02342
| FIRE-Final Inspection | 1/4/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 9:47:34 AM. Contact: ###-####. Hang extinguishers with tags; sign above door "when occupied" 1/4/2005 3:40:22 PM
|
FIR04-00506
| INSP-Final Inspection | 1/4/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | P | PART |
|
|
Need resubmittals for final as zones have changed 1/4/2005 2:47:49 PM
|
BLD04-00702
| FIRE-Conference | 1/4/2005 | 1/4/2005 | 1/4/2005 12:00:00 AM | P | PART |
|
|
Met with GC and reviewed final requirements - knox box; address; "not an exit" sign on north door; complete UG sprinkler permit and OH dry uprights; complete fire alarm resubmittals; tested the smoke vents and they all operated manually and have 360 degree fusible links 1/4/2005 2:50:27 PM
|
FIR04-00752
| INSP-Final Inspection | 1/3/2005 | 1/4/2005 | 1/3/2005 12:00:00 AM | A | PASS |
|
|
I will meet you there @ 3:00 for alarm test. Internet Inspection Request from: Trent Bice All items corrected 1/3/2005 4:25:00 PM
|