Inspections for the day of: Wednesday, January 4, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-02698 ELE-Aging Inspection1/4/20061/4/20061/5/2006 8:12:12 AM DONE
see final
ELE06-00022 Final1/3/20061/4/20061/4/2006 4:40:54 PMPPASS
north building of cloverdale funeral home///We installed a new 30 amp 120/230 volt circuit from the existing indoor panelboard inside the north building, overhead to a new outdoor panel with GFCI receptacles below it on the pole inside the Reindeer pen. Thanks!!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final
ELE05-03591 Final1/4/20061/4/20061/4/2006 3:59:46 PMPPASS
Scheduled by a contractor via Hello! on 1/4/2006 at 8:05:29 AM. Contact: ###-####.corr made, ok to final, signed occ card
ELE06-00029 Final1/4/20061/4/20061/4/2006 1:19:25 PMPCANC
TEMPORARY POWER POLE; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called contr, told no job id sticker, no address, could not be sure if at right pole, told that pole set has no gec abrasion protection broken 50a recpt, not use wire for u/g
ELE04-00301 ELE-Aging Inspection1/4/20061/4/20061/4/2006 10:35:47 AM NR
called contr to call in for final
ELE05-04120 Final1/4/20061/4/20061/4/2006 10:34:35 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack ok to final
ELE05-01506 ELE-Aging Inspection1/4/20061/4/20061/4/2006 10:23:55 AM DONE
see final
ELE06-00019 Electrical Rough-In1/3/20061/4/20061/4/2006 10:22:31 AMACANC
###-#### - nancy see conf
ELE05-04577 Final1/3/20061/4/20061/4/2006 9:37:14 AMAFAIL
Scheduled by a contractor via Hello! on 1/3/2006 at 12:46:42 PM. Contact: ###-####. called contr, left corr notice,250.53(G) electrode shall be flush with or below ground, at least 8' shall be in contact with soil
ELE05-04569 Electrical Rough-In1/3/20061/4/20061/4/2006 9:22:11 AMAFAIL
ANGELA; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left corr notice, 300.4(D) mc cable shall be 1 1/4" from edge of framing member, 330.30(B) mc cable shall be secured within 12" of box, 314.4 metal box shall be grounded, 314.23 (B)(1) nails and screws used as fastening means shall be attached using brackets or within 1/4" of back or ends of enclosure,314.23(C) enclosure shall be rigidly secured
ELE05-01630 Final1/3/20061/4/20061/4/2006 8:36:05 AMAPART
General contractor is requesting temporary occupancy; Phone #: ###-#### Internet Inspection Request from: Nikki Day new construction area only ok to final, signed struct card, will do occ when job done
ELE06-00019 Conference1/4/20061/4/20061/4/2006 12:00:00 AMADONE
told owner service shall be 8' over roof,add water ground to new service, make subpanel 4 wire
ELE05-01506 Final1/4/20061/4/20061/4/2006 12:00:00 AMAPASS
ok to final
ELE06-00019 Final1/3/20061/4/20061/3/2005 12:00:00 AMACANC
###-#### - nancy - needs to be ri first