FIR05-00902
| INSP-Sprinkler Rough-in | 1/3/2006 | 1/4/2006 | 1/5/2006 3:58:12 PM | A | PASS |
|
|
The demo work is complete for the freezer and cooler, coverage at remaining grid ceiling is adequate.
|
BLD05-00978
| FIRE-Final Inspection | 1/3/2006 | 1/4/2006 | 1/5/2006 3:29:04 PM | A | PART |
|
|
Limited use approval granted with Sam Rogers permission for the covered outside dock structure ONLY. No use or occupancy allowed for the main building at this time.
|
FIR05-00152
| INSP-Sprinkler Rough-in/Hydro | 1/3/2006 | 1/4/2006 | 1/4/2006 4:48:33 PM | P | PART |
|
|
Hydrostatic test for the UG fire supply line passed inspection.
|
FIR05-00848
| INSP-Final Inspection | 1/3/2006 | 1/4/2006 | 1/4/2006 4:40:50 PM | A | FAIL |
|
|
Strobe notification devices are not in synchronization within the TI space or within view of the adjacent common area strobes, still need to provide an updated map at the panel as requested, not all smoke alarms tested at this time.
|
FIR05-00817
| INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/4/2006 | 1/4/2006 4:35:08 PM | P | PART |
|
|
Overhead rough-in is good for cover at the hard lid areas.
|
FIR05-00594
| INSP-Sprinkler Rough-in | 1/4/2006 | 1/4/2006 | 1/4/2006 2:11:41 PM | P | PART |
|
|
Inspection for rough-in at 2nd floor hard lid area, sprinklers at ceiling pocket areas must comply with the requirements of note #137 on plan review documents. The updated approved resubmitted plans are required for future overhead inspection requests.
|
FIR05-00840
| INSP-Final Inspection | 1/3/2006 | 1/4/2006 | 1/4/2006 12:21:48 PM | A | PART |
|
|
One arm-over in the exit corridor by the SW stairs needs a hanger, per contractor the heads in the corridor to be relocated to center of ceiling tile per request by owner, some escutcheons in the elevator lobby have sheetrock mud on them.
|
BLD05-02382
| FIRE-Final Inspection | 12/30/2005 | 1/4/2006 | 1/4/2006 11:20:16 AM | A | FAIL |
|
|
Need to provide a current inspection tag on the fire extinguisher and mount to the wall as discussed along a normal path of travel with the handle no higher than 48" AFF.
|
BLD05-02877
| BLD-Aging Inspection | 1/4/2006 | 1/4/2006 | 1/4/2006 10:48:10 AM | P | PASS |
|
|
The related fire sprinkler work has been completed, life safety inspection passed.
|
FIR05-00887
| INSP-Final Inspection | 1/3/2006 | 1/4/2006 | 1/4/2006 10:28:17 AM | A | PASS |
|
|
Sprinkler work passed inspection, noted to the supervisor that a tamper switch for a valve to a hose connection at the riser was closed and reporting to the panel.
|