Inspections for the day of: Thursday, January 4, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02578 FIRE-Final Inspection1/4/20071/4/20071/4/2007 4:42:42 PMPNR
No access due to carpet installation in progress at the time of inspection.
BLD06-02569 FIRE-Final Inspection1/4/20071/4/20071/4/2007 4:41:49 PMPNR
No access due to carpet installation in progress.
FIR05-00695 INSP-Alarm Testing1/4/20071/4/20071/4/2007 3:48:50 PMPPART
Fire alarm testing completed for the 11th floor guest rooms and common corridors. Three HC accessible rooms have strobe notification devices which are not in synchronization. No testing performed for the elevator lobby, service room, nac panels, or floor control for sprinkler monitoring at this time.
FIR06-00717 INSP-Sprinkler Rough-in/Hydro1/4/20071/4/20071/4/2007 3:44:30 PMPPART
The remainder of OH sprinkler rough-in is okay to cover.
FIR06-00814 INSP-Sprinkler Rough-in/Hydro1/4/20071/4/20071/4/2007 3:43:04 PMPPART
OH rough-in is good for cover at the drop ceiling areas, final pending ceiling tile and escutcheons.
FIR06-00526 INSP-Sprinkler Rough-in/Hydro1/4/20071/4/20071/4/2007 2:04:35 PMPPART
OH hydrostatic test for the new 3" main and new branch lines completed okay.
FIR06-00655 INSP-Final Inspection1/2/20071/4/20071/4/2007 2:02:45 PMPPASS
Fire sprinkler work is satisfactory, inspection passed, permit finaled.
BLD06-02719 FIRE-Final Inspection1/4/20071/4/20071/4/2007 12:00:01 PMPPASS
Required corrections have been made, fire life safety inspection passed.