Inspections for the day of: Thursday, January 4, 2007.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01604 BMP Violation1/3/20071/4/20071/4/2007 3:53:18 PMAPASS
Site looks okay.,
ESC06-01747 BMP Violation1/3/20071/4/20071/4/2007 1:41:48 PMAFAIL
Verbal c/n to RP to address heavy trackout caused from delivery. RP will have site cleaned up by the end of the day.
ESC06-01005 Site Final1/4/20071/4/20071/4/2007 1:29:31 PMPPASS
Final stabilization has been completed.
ESC06-01318 Site Final1/4/20071/4/20071/4/2007 1:29:10 PMPPASS
Final stabilization has been completed.
ESC06-01519 Tracking Control1/4/20071/4/20071/4/2007 1:26:45 PMPPASS
Site looks okay.
ESC06-01482 BMP Violation1/3/20071/4/20071/4/2007 1:17:09 PMAPASS
Site looks okay.
ESC06-01328 BMP Violation1/3/20071/4/20071/4/2007 1:14:01 PMAPART
Site looks okay, left ESC sign for RP.
ESC06-01084 BMP Violation1/4/20071/4/20071/4/2007 1:10:17 PMPPASS
Site looks okay.
ESC06-01195 BMP Violation1/3/20071/4/20071/4/2007 1:04:04 PMPPEND
ESC06-01017 BMP Violation1/3/20071/4/20071/4/2007 1:03:38 PMPPEND
ESC06-00731 BMP Violation1/3/20071/4/20071/4/2007 1:03:16 PMPPEND
ESC06-00502 BMP Violation1/3/20071/4/20071/4/2007 1:03:04 PMPPEND
ESC06-01195 BMP Violation12/28/20061/4/20071/4/2007 1:02:52 PMAPEND
ESC06-01013 Site Final1/4/20071/4/20071/4/2007 1:00:37 PMPPASS
Final stabilization has been completed.
ESC06-01329 BMP Violation1/3/20071/4/20071/4/2007 12:59:03 PMAPART
Site looks okay, but ESC sign is not posted, left one for RP.
ESC06-01321 BMP Violation1/4/20071/4/20071/4/2007 12:57:34 PMPPASS
Site looks okay.
ESC06-01485 BMP Violation1/3/20071/4/20071/4/2007 12:48:17 PMAPART
Site looks okay, but ESC sign is still missing, left one for RP.
ESC06-01231 BMP Violation1/4/20071/4/20071/4/2007 12:37:50 PMPPART
Site looks okay, but ESC sign is not posted...left one for RP.
ESC06-01438 Tracking Control1/4/20071/4/20071/4/2007 12:32:51 PMPPASS
Site looks okay, bmp's are being maintained.
ESC06-01011 Site Final1/4/20071/4/20071/4/2007 12:30:29 PMPPASS
Final stabilzation has been completed.
ESC06-01193 Site Final1/4/20071/4/20071/4/2007 12:30:15 PMPPASS
Final stabilzation has been completed.
ESC06-01006 Site Final1/4/20071/4/20071/4/2007 12:30:01 PMPPASS
Final stabilzation has been completed.