FIR07-00818
| INSP-Sprinkler Rough-in | 1/3/2008 | 1/4/2008 | 1/7/2008 8:12:27 AM | P | NR |
|
|
Work is not ready for inspection per contractor.
|
BLD07-02112
| FIRE-Supply Line Hydro | 1/4/2008 | 1/4/2008 | 1/4/2008 4:04:47 PM | P | CANC |
|
|
Incorrect inspection type, was intended for the plumbing permit work.
|
FIR07-01004
| INSP-Sprinkler Rough-in | 1/4/2008 | 1/4/2008 | 1/4/2008 3:16:21 PM | P | PART |
|
|
Overhead fire sprinkler system modifications are acceptable.
|
FIR07-00989
| INSP-Sprinkler Rough-in/Hydro | 1/3/2008 | 1/4/2008 | 1/4/2008 3:15:10 PM | A | PART |
|
|
Noted areas okayed for cover, minor field modifications to be reflected on as-built drawings, need to perform a hydrostatic test on the new system mains and branch lines, underfloor mods approved, discussed project phasing.
|
FIR07-00191
| INSP-Final Inspection | 1/3/2008 | 1/4/2008 | 1/4/2008 3:12:00 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR07-00957
| INSP-Sprinkler Rough-in/Hydro | 1/3/2008 | 1/4/2008 | 1/4/2008 1:11:06 PM | A | PART |
|
|
OH hydrostatic testing passed, also inspected overhead rough-in and noted some issues including missing flex couplings at the riser, need bags at the heads in the paint and spray booths, provide retaining straps at the beam clamps, need to certify DCVA, noted 286 deg. heads have been installed in lieu of 200 deg. as indicated on plans, the two DSW heads at the exhaust ducts are not yet installed.
|
BLD07-00222
| FIRE-Final Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 11:43:22 AM | P | PASS |
|
|
C/N items are completed, life safety inspection passed.
|
FIR07-00677
| FIR-Aging Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 11:37:17 AM | | DEFR |
|
|
wip
|
FIR07-00973
| INSP-Final Inspection | 1/2/2008 | 1/4/2008 | 1/4/2008 11:35:30 AM | A | FAIL |
|
|
Need plan resubmittals reflecting actual field installation due to supply main relocation.
|
FIR07-00924
| INSP-Sprinkler Rough-in | 1/2/2008 | 1/4/2008 | 1/4/2008 11:33:14 AM | A | PART |
|
|
Overhead fire sprinkler system modifications are approved for cover at the drop ceilings.
|
BLD07-02501
| FIRE-Final Inspection | 1/3/2008 | 1/4/2008 | 1/4/2008 10:22:34 AM | A | PASS |
|
|
Fire life safety passed field inspection.
|