BLD09-02003
| FIRE-Conference | 1/4/2010 | 1/4/2010 | 1/6/2010 1:49:28 PM | P | DONE |
|
|
Regarding completion of work at the 4th floor prior to the 2nd floor.
|
BLD09-02197
| FIRE-Conference | 1/4/2010 | 1/4/2010 | 1/6/2010 9:09:32 AM | P | DONE |
|
|
Regarding fire code inspection for occupancy request.
|
BLD09-00616
| FIRE-Final Inspection | 12/31/2009 | 1/4/2010 | 1/5/2010 1:22:56 PM | P | PASS |
|
|
Fire life safety is acceptable pending one exit sign at the second level elevator lobby is removed- to be verified prior to structural final approval.
|
FIR09-00418
| INSP-Final Inspection | 1/4/2010 | 1/4/2010 | 1/5/2010 1:21:27 PM | P | PASS |
|
|
Existing fire sprinkler riser main control valve does not require electrical tamper supervision per Mark Senteno. Remainder of elevator recall functions tested okay. Fire alarm permit finaled.
|
BLD04-02236
| FIRE-Final Inspection | 12/30/2009 | 1/4/2010 | 1/4/2010 1:06:52 PM | A | PASS |
|
|
Fire life safety passed final walkthrough, use at one room in question has been verified as an office space.
|
FIR09-00588
| FIR-Aging Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 1:04:34 PM | | DONE |
|
|
Site work in progress, construction underway.
|
FIR09-00736
| INSP-Sprinkler Rough-in | 1/4/2010 | 1/4/2010 | 1/4/2010 1:03:39 PM | A | PART |
|
|
Overhead work approved for cover.
|
BLD09-02240
| FIRE-Final Inspection | 12/23/2009 | 1/4/2010 | 1/4/2010 1:03:02 PM | A | PASS |
|
|
Last correction item finished while on site, suite address numbers have been posted, fire life safety finaled.
|
BLD09-00017
| BLD-Final | 1/4/2010 | 1/4/2010 | 1/4/2010 1:01:35 PM | A | PASS |
|
|
Fire life safety completed acceptable, correction items are finished.
|