BLD09-00864
| FIRE-Conference | 12/16/2009 | 12/29/2009 | | A | |
|
|
Evelyn phone ###-#### Follow up on occupancy.
|
FIR09-00718
| INSP-Final Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 4:07:34 PM | P | PASS |
|
|
Permit finaled. The netcon rating was verified at 5 and all signals have been reverified.
|
FIR09-00703
| INSP-Sprinkler Rough-in | 1/4/2010 | 1/4/2010 | 1/4/2010 3:57:33 PM | P | CANC |
|
|
permit cancelled due to time constraints. Has been rescheduled for tomorrow morning
|
BLD09-01241
| FIRE-Final Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 3:49:31 PM | P | FAIL |
|
|
Emergency light needs repaired, and the two fire extinguishers need to be provided per the fire review comments.
|
BLD09-01786
| FIRE-Final Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 3:48:30 PM | P | PASS |
|
|
LIfe safety passed
|
FIR09-00575
| INSP-Sprinkler Rough-in/Hydro | 12/31/2009 | 1/4/2010 | 1/4/2010 3:48:01 PM | A | PART |
|
|
All sprinkler piping is ok to cover except the elevator lobby in the southeast corner of the second floor. In this location, I noted overspaced upright and pendant heads and the 1 1/4" branchline needs a hanger.
|