BLD11-02361
| FIRE-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 4:57:50 PM | P | PART |
|
|
Fire sprinkler work at the banquet room soffit and grid ceilings and the prep room okayed for cover.
|
FIR11-00284
| INSP-Final Inspection | 1/4/2012 | 1/4/2012 | 1/4/2012 4:55:50 PM | P | PASS |
|
|
Demo permit finaled.
|
FIR11-00636
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 4:53:42 PM | P | PART |
|
|
Verified tie-in to the existing system, approved for ceiling cover at this location.
|
FIR11-00496
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 12:57:46 PM | A | PART |
|
|
1st and 2nd floor corridors north half rough-in okayed per plan annotations.
|
FIR11-00638
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 12:07:24 PM | A | PART |
|
|
Overhead rough-in only okayed for cover.
|
BLD11-02851
| FIRE-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 12:02:22 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR11-00669
| INSP-Final Inspection | 1/4/2012 | 1/4/2012 | 1/4/2012 11:58:54 AM | A | PASS |
|
|
Modifications to the scope of work per permit documents field approved- one existing head relocated to meet coverage requirements in place of adding an additional pendent. Permit finaled.
|
FIR11-00679
| INSP-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 11:54:11 AM | A | PASS |
|
|
Scope of fire alarm work passed functional testing. Permit finaled.
|