FIR16-00322
| INSP-Final Inspection | 12/30/2016 | 1/4/2017 | 1/4/2017 12:22:51 PM | P | CANC |
|
|
Could not test level 2 due to a cut pipe, cut to piping was made after hydrostatic test. Alarm inspection failed due to sync issues on level 4, cannot perform final inspection on fire sprinklers until fire alarm issue is resolved.
|
FIR16-00437
| INSP-Final Inspection | 1/3/2017 | 1/4/2017 | 1/4/2017 12:18:51 PM | P | FAIL |
|
|
Audible devices on level 4 are going out of sync, alarms will need to be re-inspected.
|
FIR16-00510
| INSP-Sprinkler Rough-in/Hydro | 12/30/2016 | 1/4/2017 | 1/4/2017 11:17:51 AM | P | PART |
|
|
Rough to cover ispection for overhead fire sprinkler piping on levels 1 and 2 complete, approved for cover, hydrostatic test will be completed at a later date.
|
FIR16-00223
| INSP-Sprinkler Rough-in | 1/3/2017 | 1/4/2017 | 1/4/2017 10:52:03 AM | A | DONE |
|
|
Request was for a conference, discussed options for structural beams located on level 2.
|
FIR16-00656
| INSP-Final Inspection | 1/4/2017 | 1/4/2017 | 1/4/2017 10:30:43 AM | P | CANC |
|
|
Inspection request rescheduled due to scheduling conflict.
|
FIR16-00535
| INSP-Final Inspection | 1/3/2017 | 1/4/2017 | 1/4/2017 10:30:22 AM | P | CANC |
|
|
Inspection request rescheduled due to scheduling conflict.
|
FIR16-00594
| INSP-Final Inspection | 1/4/2017 | 1/4/2017 | 1/4/2017 10:07:48 AM | P | PART |
|
|
Partial final inspection complete for fire alarm system, city approved drawings match the installation. Need to verify audio shutdown on DJ equipment during a fire alarm event, permit cannot be finaled until audio shutdown is inspected and passed.
|