Inspections for the day of: Friday, January 5, 2001.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00030 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
randy ###-#### Bldg 15, cup bay 1 s/a/5/4 Demo 18" main and replace with 12" PSP main
MEC01-00031 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
###-#### Bldg 15 photo bay 6* S/A 1537 facilitate three DUV stepper 1700 and three dns tracks
MEC01-00033 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
###-#### Bldg 15*Photo Bay 5 S/A 1534 Facilitate three 700 steppers, laser and DNS tracks
MEC01-00034 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
bldg 15 cup bay 1 S/A 1514*Make a loop system wiht the general exhaust-###-####
MEC01-00040 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg #15-CUP Bay 1- S/A 1514 Facilitate one stubby producer AP###-####
MEC01-00041 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6###-#### Bldg 15-cup bay 2, s/a1522 defacilitate the four AG's #300-303
MEC01-00043 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6692-
###-####-Bldg #15-Dry ETCH Bay 2-S/D 1509-Defacilitate the AMD #316
MEC01-00044 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg 315-Cup bay 1-S/A 1514**Facilitate one gas cabinet #6742 ###-####
MEC01-00045 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
###-####-Bldg #15-CUP Bay -Relocate the 1PM tool to the CUP Bay 1-#6789
MEC01-00046 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg #15-Dry Etch Bay 2 Photo bay 2, Segregate the return air between dry Etch 2 and photo 2 #6413 ###-####
MEC01-00047 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg #15-Mech room install red iron for the new compressor skid-#6###-####
MEC01-00049 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg #15-CUP Bay 1- S/A 1514-Demo out saw hood and modify supply duct-#6584 ###-####
MEC01-00050 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6614-Bldg 315-Mech room facilitate one edward tcs abatement system. ###-####
MEC01-00052 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg 315-Mech Room Facilitate one UmB gas bar for the Novellus HPP#2-#6732 ###-####
MEC01-00053 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6741-Bldg #15-Mech Room Cap off sa and rf 3189 and demo out all duct ###-####
MEC01-00054 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg #15-Mech room facilitate one H2/N2 blending station-#6707 ###-####
MEC01-00055 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bld #15-Mech Room Rub Make-up air to the blending station controller bar. #6749 ###-####
MEC01-00056 Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
R/I YMC -###-####
MEC01-00057 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
###-####-#6559 bld 15-Dry etch Bay 6-S/A1531 Falcilitate one PLAM AP390 going into dry etch 6
MEC01-00058 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg 15-RDA Bay A/A 152-Facilitate one "M" tool-#6706 ###-####
MEC01-00059 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Bldg 15-CVTR Bays 1,2,3,-Facilitate 10 heate exchanger-###-#### #6503
MEC01-00060 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6207-Bldg 15-S/A 1523 convert the ozone generators to new PSP duct ###-####
MEC01-00061 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
#6268 bldg #15 cup 1-S/A 1522 Reverse all of the saddles on the general exhaust. ###-####
MEC00-04504 Final1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/04/2001 at 15:49:18. Contact: ###-####.
MEC00-02566 Rough-in1/5/20011/5/20011/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/05/2001 at 09:06:48. Contact: ###-####.PARTIAL ONLY ok for ceiling cover 1/5/2001 2:31:23 PM
MEC00-03863 Final1/5/20011/5/20011/5/2001 12:00:00 AMPPASS
###-####
MEC01-00048 Rough-in1/5/20011/5/20011/5/2001 12:00:00 AMPPART
Xenon ###-####
MEC00-04450 Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMPPART
###-#### duct in chase only 1/5/2001 10:29:21 AM