Inspections for the day of: Friday, January 5, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02884 BLD-Footing1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by Inspector: 415 On 1/4/2001 4:14:44 PM
wip on west retaining and foundation footing,, recvd letter from soil eng. 1/5/2001 9:41:04 AM
BLD00-01736 BLD-Framing/Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
FR PHIL- ###-####
c/n is ok 1/5/2001 12:11:02 PM
BLD00-01736 BLD-Energy code compliance1/4/20011/5/20011/5/2001 12:00:00 AMAPASS
PHIL ###-#### ENERGY CODE
BLD00-02946 BLD-Energy code compliance1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:02:03. Contact: ###-####.seal ok, ok to insulate 1/5/2001 12:20:41 PM
BLD00-02946 BLD-Framing/Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:02:37. Contact: ###-####.
ok to insulate, need to verify int shear and fire wall seal 1/5/2001 12:20:14 PM
BLD00-02947 BLD-Energy code compliance1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:03:45. Contact: ###-####.
seal is ok, ok to insulate 1/5/2001 12:19:23 PM
BLD00-02416 BLD-Framing/Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:04:01. Contact: ###-####.
ext. shear ok on house and garage 1/5/2001 11:48:16 AM
BLD00-02947 BLD-Framing/Rough-in1/4/20011/5/20011/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:04:13. Contact: ###-####.
ok to insulate, need to verify int. shear and fire wall seal 1/5/2001 12:21:54 PM
BLD00-01864 BLD-Final1/4/20011/5/20011/5/2001 12:00:00 AMPFAIL
FN OCC-- ROD- ###-#### OR ###-####
trades not signed off,, conference on hand rail, guard rail, landings, landscape etc. 1/5/2001 3:27:08 PM
BLD00-03348 BLD-Framing/Rough-in1/5/20011/5/20011/5/2001 12:00:00 AMPPART
fr dave miller ###-#### -7th floor
c/n posted, ok to cover 1st phase of interior walls, pending architect letter. verify bracing of walls @ ceiling grid inspection. see prior notes 1/5/2001 1:54:00 PM
MEC00-04052 Final1/5/20011/5/20011/5/2001 12:00:00 AMPPASS
fn ed-- ###-####
BLD00-03013 BLD-Final1/5/20011/5/20011/5/2001 12:00:00 AMPPASS
ed-- ###-#### fn
c of c # 19905 issued 1/5/2001 12:58:10 PM
BLD00-03397 BLD-Footing1/5/20011/5/20011/5/2001 12:00:00 AMPPART
russ ###-####
already poured point load ftgs 1/5/2001 3:50:13 PM
MEC01-00065 Pressure Test1/5/20011/5/20011/5/2001 12:00:00 AMPPASS
Nancy Grayson ###-####