BLD00-02884
| BLD-Footing | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 1/4/2001 4:14:44 PM
wip on west retaining and foundation footing,, recvd letter from soil eng. 1/5/2001 9:41:04 AM
|
BLD00-01736
| BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PASS |
|
|
FR PHIL- ###-####
c/n is ok 1/5/2001 12:11:02 PM
|
BLD00-01736
| BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PASS |
|
|
PHIL ###-#### ENERGY CODE
|
BLD00-02946
| BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:02:03. Contact: ###-####.seal ok, ok to insulate 1/5/2001 12:20:41 PM
|
BLD00-02946
| BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:02:37. Contact: ###-####.
ok to insulate, need to verify int shear and fire wall seal 1/5/2001 12:20:14 PM
|
BLD00-02947
| BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:03:45. Contact: ###-####.
seal is ok, ok to insulate 1/5/2001 12:19:23 PM
|
BLD00-02416
| BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:04:01. Contact: ###-####.
ext. shear ok on house and garage 1/5/2001 11:48:16 AM
|
BLD00-02947
| BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:04:13. Contact: ###-####.
ok to insulate, need to verify int. shear and fire wall seal 1/5/2001 12:21:54 PM
|
BLD00-01864
| BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | FAIL |
|
|
FN OCC-- ROD- ###-#### OR ###-####
trades not signed off,, conference on hand rail, guard rail, landings, landscape etc. 1/5/2001 3:27:08 PM
|
BLD00-03348
| BLD-Framing/Rough-in | 1/5/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | PART |
|
|
fr dave miller ###-#### -7th floor
c/n posted, ok to cover 1st phase of interior walls, pending architect letter. verify bracing of walls @ ceiling grid inspection. see prior notes 1/5/2001 1:54:00 PM
|
MEC00-04052
| Final | 1/5/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | PASS |
|
|
fn ed-- ###-####
|
BLD00-03013
| BLD-Final | 1/5/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | PASS |
|
|
ed-- ###-#### fn
c of c # 19905 issued 1/5/2001 12:58:10 PM
|
BLD00-03397
| BLD-Footing | 1/5/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | PART |
|
|
russ ###-####
already poured point load ftgs 1/5/2001 3:50:13 PM
|
MEC01-00065
| Pressure Test | 1/5/2001 | 1/5/2001 | 1/5/2001 12:00:00 AM | P | PASS |
|
|
Nancy Grayson ###-####
|