Inspections for the day of: Monday, January 5, 2004.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Ray
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE03-03210 Final1/2/20041/5/20041/5/2004 12:00:00 AMANH
Scheduled by a contractor via Hello! on 1/2/2004 at 4:00:02 PM. Contact: ###-####. locked no access 1/5/2004 9:41:48 AM
ELE03-04037 Electrical Rough-In1/2/20041/5/20041/5/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/2/2004 at 5:35:03 PM. Contact: ###-####.
ELE03-03332 Electrical Rough-In1/5/20041/5/20041/5/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 1/5/2004 at 7:50:11 AM. Contact: ###-####. r/i walls only ok for cover 1/5/2004 2:17:40 PM
ELE03-03919 Final1/5/20041/5/20041/5/2004 12:00:00 AMPPART
chad-- ###-#### electrode ok for cover with two inches of concrete / not a final 1/5/2004 2:21:25 PM
ELE03-03547 Final12/31/20031/5/200412/31/2003 1:33:24 PMPCANC
Scheduled by a contractor via Hello! on 12/31/2003 at 1:31:38 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 31 2003 1:33PM.