FIR04-00057
| INSP-Final Inspection | 12/30/2004 | 1/5/2005 | 1/5/2005 12:00:00 AM | A | FAIL |
|
|
The toaster under the fryer hood did not lose power when the suppression system activated. All other items worked. Pull station locations are ok to remain as is. 1/5/2005 10:19:47 AM
|
FIR04-00623
| INSP-Sprinkler Rough-in | 1/4/2005 | 1/5/2005 | 1/5/2005 12:00:00 AM | A | FAIL |
|
|
Provide trip test and hydro test for the overhead system per review notes #60 and #61. Provide flexible coupling at the tie in per plans and review notes. 1/5/2005 12:41:55 PM
|
FIR04-00778
| INSP-Sprinkler Rough-in | 1/5/2005 | 1/5/2005 | 1/5/2005 12:00:00 AM | P | CANC |
|
|
Duplicate inspection 1/5/2005 2:54:35 PM
|
FIR04-00778
| INSP-Final Inspection | 1/5/2005 | 1/5/2005 | 1/5/2005 12:00:00 AM | P | FAIL |
|
|
Provide access to the east side of the new wall for inspection of the existing sprinkler heads. Provide annual inspection for the existing sprinkler riser. I notified manager of Emser Tile that the new area is not to be used until all inspections had been approved or action would be taken by the building and fire departments. 1/5/2005 2:56:27 PM
|
FIR04-00627
| INSP-Sprinkler Rough-in | 1/5/2005 | 1/5/2005 | 1/5/2005 12:00:00 AM | P | PART |
|
|
The remaining underground supply piping to the tie in at the street is ok to cover. The underground supply piping from the roadway the the stub out still needs inspection 1/5/2005 2:54:04 PM
|
FIR04-00689
| INSP-Final Inspection | 1/5/2005 | 1/5/2005 | 1/5/2005 12:00:00 AM | P | FAIL |
|
|
No approved plans on site. Contractor was gone 1/5/2005 4:23:35 PM
|