Inspections for the day of: Thursday, January 5, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00665 FIR-Aging Inspection1/5/20061/5/20061/6/2006 1:37:51 PM NR
Will be called in next week for inspection
BLD04-02937 FIRE-Final Inspection1/4/20061/5/20061/5/2006 4:34:49 PMPPART
The only life safety items looked at so far are the exit signs and emergency lights in the new areas which passed except for the east corridor exit discharge light.
FIR05-00660 INSP-Final Inspection1/5/20061/5/20061/5/2006 4:33:42 PMPPASS
Permit finaled
FIR05-00571 INSP-Final Inspection1/5/20061/5/20061/5/2006 4:32:16 PMPCANC
No inspection done due to lack of time but did notice water was turned off and tamper switches were not working
FIR05-00487 INSP-Final Inspection1/5/20061/5/20061/5/2006 4:30:02 PMPFAIL
See back of review comments for a list of items needing correction. This list is only partial as the inspection is not complete. All signals need to be redone since the monitoring account was not set up. An additional pull station is required.
BLD04-02997 FIRE-Final Inspection1/3/20061/5/20061/5/2006 4:24:02 PMPCANC
Scheduled by a contractor via Hello! on 1/3/2006 at 8:38:54 AM. Contact: ###-####.
FIR05-00832 INSP-Sprinkler Rough-in1/4/20061/5/20061/5/2006 4:23:22 PMPPART
Sprinkler rough-in is basically ok and matches plans but plans need resubmitted per review comments
FIR05-00850 INSP-Sprinkler Rough-in/Hydro1/4/20061/5/20061/5/2006 1:41:11 PMPPART
Underground stub out from building is ok to cover only.
BLD05-02689 FIRE-Final Inspection1/5/20061/5/20061/5/2006 1:06:18 PMPPART
A temporary occupancy was given with dave hanneman's permission until the knox box is installed. Address on the outside of the building needs changed
FIR05-00029 INSP-Sprinkler Rough-in/Hydro1/4/20061/5/20061/5/2006 12:59:37 PMAPASS
overhead / underground hydro passed
FIR05-00858 INSP-Sprinkler Rough-in1/4/20061/5/20061/5/2006 10:26:22 AMAPASS
Arm overs and drops with hangers from the existing branchlines are ok. Still need to verify that any armovers installed when the ceiling tile is put in do not require hangers. Once that is done ceiling tile can be installed and final head spacing verified. Heads on south side of the new demizing wall are ok as well.
FIR05-00773 INSP-Final Inspection1/4/20061/5/20061/5/2006 10:03:53 AMAFAIL
Can't final until the canopies that are missing are installed.
FIR05-00312 INSP-Supply line flush1/4/20061/5/20061/5/2006 8:45:34 AMAPASS
Underground flush passed