FIR05-00665
| FIR-Aging Inspection | 1/5/2006 | 1/5/2006 | 1/6/2006 1:37:51 PM | | NR |
|
|
Will be called in next week for inspection
|
BLD04-02937
| FIRE-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 4:34:49 PM | P | PART |
|
|
The only life safety items looked at so far are the exit signs and emergency lights in the new areas which passed except for the east corridor exit discharge light.
|
FIR05-00660
| INSP-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 4:33:42 PM | P | PASS |
|
|
Permit finaled
|
FIR05-00571
| INSP-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 4:32:16 PM | P | CANC |
|
|
No inspection done due to lack of time but did notice water was turned off and tamper switches were not working
|
FIR05-00487
| INSP-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 4:30:02 PM | P | FAIL |
|
|
See back of review comments for a list of items needing correction. This list is only partial as the inspection is not complete. All signals need to be redone since the monitoring account was not set up. An additional pull station is required.
|
BLD04-02997
| FIRE-Final Inspection | 1/3/2006 | 1/5/2006 | 1/5/2006 4:24:02 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/3/2006 at 8:38:54 AM. Contact: ###-####.
|
FIR05-00832
| INSP-Sprinkler Rough-in | 1/4/2006 | 1/5/2006 | 1/5/2006 4:23:22 PM | P | PART |
|
|
Sprinkler rough-in is basically ok and matches plans but plans need resubmitted per review comments
|
FIR05-00850
| INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/5/2006 | 1/5/2006 1:41:11 PM | P | PART |
|
|
Underground stub out from building is ok to cover only.
|
BLD05-02689
| FIRE-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 1:06:18 PM | P | PART |
|
|
A temporary occupancy was given with dave hanneman's permission until the knox box is installed. Address on the outside of the building needs changed
|
FIR05-00029
| INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/5/2006 | 1/5/2006 12:59:37 PM | A | PASS |
|
|
overhead / underground hydro passed
|
FIR05-00858
| INSP-Sprinkler Rough-in | 1/4/2006 | 1/5/2006 | 1/5/2006 10:26:22 AM | A | PASS |
|
|
Arm overs and drops with hangers from the existing branchlines are ok. Still need to verify that any armovers installed when the ceiling tile is put in do not require hangers. Once that is done ceiling tile can be installed and final head spacing verified. Heads on south side of the new demizing wall are ok as well.
|
FIR05-00773
| INSP-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 10:03:53 AM | A | FAIL |
|
|
Can't final until the canopies that are missing are installed.
|
FIR05-00312
| INSP-Supply line flush | 1/4/2006 | 1/5/2006 | 1/5/2006 8:45:34 AM | A | PASS |
|
|
Underground flush passed
|