ESC05-01589
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:35:19 PM | A | PART |
|
|
verbal c/n to RP. watch trackout on streets and sidewalks and remind excavator to clean up at the end of the day.
|
ESC05-01591
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:30:17 PM | A | PART |
|
|
verbal c/n to RP. sediment on sidewalks and gutters need addressed. also if construction entrance is still being used, it needs to be updated and maintained.
|
ESC05-01088
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:26:02 PM | A | PASS |
|
|
Site looks good.
|
ESC05-01382
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:24:01 PM | A | PART |
|
|
verbal c/n to RP. trackout from driveway needs cleaned up, and some gravel bags are needed downhill in gutter to protect d/i at base of hill.
|
ESC05-01004
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:16:43 PM | A | FAIL |
|
|
verbal c/n to RP, trash on site needs maintained and ESC sign has faded.
|
ESC05-01156
| Tracking Control | 12/15/2005 | 1/5/2006 | 1/5/2006 3:13:12 PM | A | PART |
|
|
contacted RP about replacing wattle at base of driveway and cleaning up debris in gutter along front of property.
|