Inspections for the day of: Friday, January 5, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00358 FIR-Aging Inspection1/5/20071/5/20071/9/2007 1:18:41 PM DONE
Work in progress.
BLD06-01831 FIRE-Final Inspection1/4/20071/5/20071/5/2007 4:59:25 PMAPART
Agreed in conjunction with the structural inspector to allow temporary occupancy pending the replacement of four light fixtures with defective emergency ballasts. Corrections are to be made and verified for completion early next week as discussed.
FIR05-00695 INSP-Alarm Testing1/5/20071/5/20071/5/2007 4:54:31 PMPPART
Correction notice items from previous inspectons for guest rooms and common corridors on floors 6 thru 11 have been verified for completion with the exception of HC guest rooms visible notification appliance synchronization.
FIR06-00837 INSP-Sprinkler Rough-in/Hydro1/4/20071/5/20071/5/2007 2:22:11 PMAPART
OH install appears satisfactory, final approval pending inspection for spacing at the curtain when complete.
FIR06-00653 INSP-Final Inspection1/4/20071/5/20071/5/2007 12:48:30 PMAPART
Inspection for gate 11 passed, final for this permit pending completion of fire sprinkler modifications at gate 14.
FIR06-00660 INSP-Supply line flush1/4/20071/5/20071/5/2007 12:05:20 PMAPART
UG supply line flush completed.
FIR06-00677 INSP-Sprinkler Rough-in1/4/20071/5/20071/5/2007 11:34:35 AMAPART
Sprinkler rough-in is now approved for cover at the kitchen drop ceiling area.
BLD06-02813 FIRE-Final Inspection1/4/20071/5/20071/5/2007 11:13:06 AMAPASS
Previous c/n items are complete, inspection passed.
BLD06-03086 FIRE-Conference1/4/20071/5/20071/5/2007 10:48:51 AMADONE
On site confrence to discuss demo schedule for the remodel area as it affects the existing fire sprinkler system. Contractor agreed to leave the CPVC system in service until such time as the combustible loading and debris within the space are removed, after which time the CPVC system may be isolated to the remodel area only and a fire watch by hospital security is to be implemented until such time as the new sprinkler system piping is installed per permit scope.
BLD06-00088 FIRE-Final Inspection1/5/20071/5/20071/5/2007 10:19:14 AMAPASS
Final fire life safety inspection passed, one missing 2nd pc. 401 escutcheon at the SW below the stairs to be installed today.
FIR06-00476 INSP-Final Inspection1/4/20071/5/20071/5/2007 9:20:03 AMACANC
Please call Brian one hour before arriving.
His number is ###-####. Thanks Phone #: ###-#### Inspection cancelled from web by: Stan Beus