Inspections for the day of: Monday, January 5, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00531 INSP-Sprinkler Rough-in/Hydro1/2/20091/5/20091/6/2009 1:56:33 PMAPASS
The rough-in inspection for the existing area passed the two systems still need to be tied together. The overhead hydro test passed. The sprinkler piping is ok to cover.
BLD07-02324 FIRE-Final Inspection1/5/20091/5/20091/5/2009 5:03:51 PMPPASS
Life safety passed
BLD07-02321 FIRE-Final Inspection1/5/20091/5/20091/5/2009 4:56:28 PMPPASS
Life safety passed
BLD08-02227 FIRE-Final Inspection1/5/20091/5/20091/5/2009 2:38:43 PMPFAIL
Provide emergency lighting as discussed in the east side/existing open office and corridors.
FIR08-00792 INSP-Final Inspection1/5/20091/5/20091/5/2009 2:37:39 PMPPASS
Permit finaled. End of line voltage drop verified. Two existing speaker/strobes had not been demo'ed but I allowed them to remain since they did not adversly effect the voltage drop. One speaker/strobe is to be relocated and the candella in the breakroom was changed from 15 to 30.
FIR08-00862 INSP-Final Inspection1/2/20091/5/20091/5/2009 12:00:25 PMAPASS
Permit finaled