Inspections for the day of: Tuesday, January 5, 2010.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00470 General Inspection1/5/20101/5/20101/5/2010 2:58:56 PMPPART
Cleanup of excessive mud on street has been done. Storm drains are double protected to meet MEP considering weather conditions. Did not see posted sign. Overall site does not look bad, contractor needs to prepare to stabilize site to re-vegetate as soon as practical.
ESC09-00352 General Inspection1/5/20101/5/20101/5/2010 1:46:25 PMPPASS
Composted wattle installed along Walling Creek & wetlands located on the Northwest corner of graded area.