FIR06-00594
| FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/10/2011 3:48:45 PM | | DONE |
|
|
|
FIR07-00817
| FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 5:48:03 PM | | DONE |
|
|
Construction suspended.
|
FIR10-00035
| FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 5:46:16 PM | | DONE |
|
|
Pending inspection request
|
FIR10-00125
| FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 5:45:11 PM | | PASS |
|
|
|
FIR10-00606
| INSP-Conference | 1/5/2011 | 1/5/2011 | 1/5/2011 5:44:12 PM | P | DONE |
|
|
Conversation with contractor regarding hydrostatic testing.
|
FIR10-00126
| INSP-Sprinkler Rough-in | 1/5/2011 | 1/5/2011 | 1/5/2011 5:41:51 PM | P | PASS |
|
|
Scope of demo permit work is finished.
|
FIR09-00080
| INSP-Alarm Testing | 1/5/2011 | 1/5/2011 | 1/5/2011 5:39:59 PM | P | PART |
|
|
Final pending tamper switch repair at the fire sprinkler system main control valve.
|
BLD10-02356
| FIRE-Conference | 1/5/2011 | 1/5/2011 | 1/5/2011 5:38:55 PM | P | DONE |
|
|
Discussion with contractor regarding emergency lighting requirements.
|