FIR11-00684
| INSP-Sprinkler Rough-in | 1/5/2012 | 1/5/2012 | 1/6/2012 5:32:03 PM | P | PART |
|
|
Overhead work as marked on plans approved for cover.
|
FIR11-00682
| INSP-Final Inspection | 1/5/2012 | 1/5/2012 | 1/6/2012 5:29:01 PM | P | PASS |
|
|
Scope of work completed, hydrostatic testing passed. Permit finaled.
|
BLD11-02799
| FIRE-Final Inspection | 1/3/2012 | 1/5/2012 | 1/5/2012 2:41:57 PM | A | PASS |
|
|
Noted corrections finished. Life safety finaled.
|
FIR11-00673
| INSP-Conference | 1/5/2012 | 1/5/2012 | 1/5/2012 2:34:50 PM | P | DONE |
|
|
Regarding approved plan and site work in progress.
|
BLD11-00407
| FIRE-Final Inspection | 1/4/2012 | 1/5/2012 | 1/5/2012 2:33:45 PM | A | PASS |
|
|
Fire life safety inspection for the scope of work completed. Locks at the egress side doors from the parking deck to the stair towers to be removed prior to structural final as agreed.
|
FIR11-00556
| INSP-Final Inspection | 1/4/2012 | 1/5/2012 | 1/5/2012 2:30:35 PM | A | NR |
|
|
Robert Phone #: ###-####
|
BLD11-02367
| FIRE-Final Inspection | 1/4/2012 | 1/5/2012 | 1/5/2012 2:30:16 PM | A | NR |
|
|
wants temp //Bob Phone #: ###-####
|
FIR11-00667
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 2:29:54 PM | A | FAIL |
|
|
Head spacing at the new storage room exceeds 130ft2, missing retainers at beam clamps.
|