FIR03-00052
| FIR-Aging Inspection | 1/5/2012 | 1/5/2012 | 1/11/2012 11:28:43 AM | | DONE |
|
|
No contractor scheduled inspections for seven years and I have been unable to contact the contractor for the last two years. Permit is being DOC finaled.
|
BLD11-02954
| FIRE-Conference | 1/4/2012 | 1/5/2012 | 1/5/2012 3:56:46 PM | A | PASS |
|
|
Matt and I went over life safety requirements.
|
BLD11-01490
| FIRE-Final Inspection | 1/4/2012 | 1/5/2012 | 1/5/2012 11:37:50 AM | A | PASS |
|
|
life safety passed
|
FIR11-00632
| INSP-Final Inspection | 1/5/2012 | 1/5/2012 | 1/5/2012 11:37:20 AM | P | PASS |
|
|
permit finaled
|
FIR11-00543
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 11:26:16 AM | A | PART |
|
|
Area "B" was inspected today. The general installation is ok but the 4" main routing has been changed by the addition of four elbows. Plans need to be resubmitted with revised hydraulic calculations due to the remote area only having a 5% cushion. The earth quake bracing is not complete on the 4" main. No cover in area "B" until I can verify the E.Q. bracing.
|
BLD11-01767
| FIRE-Final Inspection | 1/4/2012 | 1/5/2012 | 1/5/2012 11:14:43 AM | A | PASS |
|
|
life safety passed
|
FIR11-00631
| INSP-Sprinkler Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 9:57:19 AM | A | PASS |
|
|
Rough-in passed. Office area piping is not yet complete. Also still need the hydro tests and air test of the dry system.
|