Inspections for the day of: Monday, January 5, 2015.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00940 INSP-Final Inspection1/5/20151/5/20151/5/2015 3:21:59 PMPFAIL
No testing performed because hood, manual pull station and compartment exiting does not meet the code requirements and previous discussion with the fire dept and architect for placement of such devices.
FIR14-00423 INSP-Sprinkler Rough-in/Hydro1/5/20151/5/20151/5/2015 3:13:22 PMPPASS
Overhead hydro test passed
FIR14-00902 INSP-Sprinkler Rough-in/Hydro12/31/20141/5/20151/5/2015 3:12:54 PMPPASS
Rough-in passed. I spoke to Cam about a possible pendant head addition in the walk-in shower and I spoke to Tyler about the need for proper clearance at the cpvc riser. Piping can not be covered until a tenting inspection has been passed.