BLD15-04045
| FIRE-Final Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 3:03:13 PM | P | PASS |
|
|
life safety passed
|
FIR15-00894
| INSP-Final Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 2:50:07 PM | P | FAIL |
|
|
The audio and visual are not syncing as required. There are two distinct audible pulses at the west side of the building. I found two locations where there are atleast three visual flashes. Also the mens and womens showers and the old anecoic (sound) chamber have not been addressed for audio/visuals. The fire alarm contractor needs to address any and all deficiencies of the fire alarm system for this new occupancy.
|
NAF15-00042
| INSP-Sprinkler Rough-in | 12/31/2015 | 1/5/2016 | 1/5/2016 1:40:23 PM | P | FAIL |
|
|
Minumum 4'6" bury dept not met.
|
GCB15-00040
| FIRE-Final Inspection | 1/4/2016 | 1/5/2016 | 1/5/2016 11:37:55 AM | A | FAIL |
|
|
Need the city approved drawings and notes. TJ and I went over life safety requirements. I looks like the biggest issue will be door haredware.
|
FIR15-00853
| INSP-Final Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:56:14 AM | P | PASS |
|
|
Permit finaled
|