BLD16-04329
| BLD-Foundation | 1/4/2017 | 1/5/2017 | 1/5/2017 4:31:31 PM | P | PEND |
|
|
Rebar // Robert Phone #: ###-#### pours pushed bak to monday
|
BLD15-04063
| BLD-Wall Bracing | 1/4/2017 | 1/5/2017 | 1/5/2017 4:30:43 PM | A | CANC |
|
|
2nd floor // Kent Phone #: ###-####
|
BLD15-04063
| BLD-Framing/Rough-in | 1/4/2017 | 1/5/2017 | 1/5/2017 4:30:10 PM | A | PART |
|
|
2nd floor // Kent Phone #: ###-#### drops on fl two ok and drops in hallway on 4 ok
|
BLD14-02173
| BLD-Wall cover | 1/5/2017 | 1/5/2017 | 1/5/2017 4:27:59 PM | P | PASS |
|
|
stair 1 rated wall. levels 2-6. Shaft enclosure at stand pipe levels 2,3,4. Phone #: ###-#### Inspection requested via web by Jon Pederson stair tower 2-6 ok standpipe on 3ok ok to keep working on the rest
|
BLD16-02926
| BLD-Final | 1/4/2017 | 1/5/2017 | 1/5/2017 10:50:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert ODell
|
BLD16-02926
| DOC - Permit Finaled | 1/5/2017 | 1/5/2017 | 1/5/2017 10:50:24 AM | P | PASS |
|
|
|