BLD16-03926
| FIRE-Final Inspection | 1/4/2017 | 1/5/2017 | 1/5/2017 2:04:26 PM | A | PASS |
|
|
life safety passed
|
FIR16-00822
| INSP-Sprinkler Rough-in | 1/4/2017 | 1/5/2017 | 1/5/2017 10:22:50 AM | A | PASS |
|
|
The phase 1 sprinkler piping is ok to cover. I noted one overspaced head in a office where the 9' rule is being used off of two walls which is not allowed. I will verify it has been fixed at the next inspection. Piping is ok to cover.
|
BLD16-02639
| FIRE-Final Inspection | 1/4/2017 | 1/5/2017 | 1/5/2017 10:21:30 AM | A | PASS |
|
|
Life safety passed
|
BLD16-03662
| FIRE-Final Inspection | 1/4/2017 | 1/5/2017 | 1/5/2017 9:51:43 AM | A | CANC |
|
|
Randy Phone #: ###-####
|
FIR16-00775
| INSP-Final Inspection | 1/5/2017 | 1/5/2017 | 1/5/2017 9:47:36 AM | P | FAIL |
|
|
No access. To be rescheduled for tomorrow
|